Laserfiche WebLink
pin <br />n 2. SCOPE OF SERVICES AND SCHEDULE <br />When anon -call engagement is requested for a project in <br />SCST's project manager will prepare a comprehensive, <br />detailed scope of services, and a cost estimate/budget <br />for the project based on the project schedule, and the <br />plans and specifications. We will work with the City to <br />develop realistic and responsible solutions for each <br />specific project's needs. <br />In order to conform to a project budget, SCST's project <br />manager provides individuals working on a specific <br />task with the expected time allotted for that task. By <br />establishing a budget and communicating the project <br />expectations for our services at the beginning of a <br />project to all individuals involved, SCST can complete <br />tasks efficiently and maintain the estimated project <br />budget. Additionally, our professional staff is involved <br />with the project fieldwork and report preparation, <br />providing continuity and efficiency during a project. <br />Our specific approach to services consists of: <br />Assigning and Scheduling of Staff: Selecting the <br />appropriate inspector or technician for a project is <br />one of SCST's highest priorities. As stated above,' <br />SCST will provide City with multi -carded inspectors <br />or technicians whenever possible. We utilize Agile <br />Frameworks MetaField® V2i6 software for efficient - <br />scheduling and managing of field, laboratory, and <br />office personnel. The daily schedule is available to <br />all personnel, enabling us to maximize staff utilization <br />and avoid duplication. Our technicians and inspectors <br />will be available within 24 hours of a request from City. <br />Testing, Field Work, and Deliverables/Reporting: <br />The assigned inspector or technician will report to the <br />appropriate on -site contact and sign -in if necessary. <br />They will meetwith the City's designated representative <br />to review the approved plans and specifications, and <br />to assure that these documents are clearly understood <br />and the City's needs are being fully addressed. <br />The inspector or technician will perform the required <br />inspection and/or testing service in accordance with <br />the approved project drawings and specifications. <br />Any required samples will be procured, labeled, <br />electronically logged, and scheduled for pickup. <br />Our field representative will document findings or <br />test results with a report of their daily activities and <br />the status of compliance with project requirements, <br />and present the report or results to the City's <br />designated representative for a signature. The signing <br />representative, SCST's project manager and any <br />pertinent project team members will then automatically <br />receive an email copy ofthe report or results. Notification <br />of any non -compliant work will be noted and clearly <br />reported to the City's designated representative. <br />SCST also utilizes Agile Frameworks MetaField@ <br />V2.6 for our field reporting and testing, which allows <br />us to upload daily reports and testing results to a <br />central database from the field via cell phone where <br />they are reviewed by the project manager. Information <br />is then digitally signed and forwarded to the client, or <br />accessed by the client via a customer facing portal <br />via the cloud. Field inspection reports are typically <br />available the same day. <br />Samples are delivered to SCST's laboratory and <br />are scheduled for testing at required dates by the <br />appropriate testing methods. Test results are forwarded <br />using Agile Frameworks MetaField® V2.6 to SCST's <br />project manager for review and distribution. Should <br />testing result in non-compliance, the designated City <br />representative is notified immediately and a log of <br />non-conformance is automatically tracked per project <br />using the MetaField® V2.6 system. <br />Final Report/Deliverables/Closeout: As the <br />construction contract enters the completion phase, <br />SCST's team will work with the City to develop a <br />functional closeout plan. We will use our experience to <br />identify remaining inspection requirements, and submit <br />final reports in a timely manner. In order to expedite the <br />final reports, our field daily reports and laboratory test <br />results are automatically filed and reviewed throughout <br />the duration of the project. Typically, SCST can prepare <br />these reports within three days of the completion of <br />our work, depending on the size and scope of the <br />project. Daily reports and all laboratory test results are <br />compiled into a FinalConstructionQuality Assurance <br />report that displays all field inspection reports, batch <br />plant inspection reports, laboratory testing reports, <br />and a summary of the field density tests performed <br />on the project. The final report can include any <br />information requested by the City, such as inspector's <br />names, certifications, or laboratory certifications. <br />City of Santa Ana RFP No. 18-045, Geotechnical Engineering Services <br />SCST Proposal No. 18-0308 <br />