Laserfiche WebLink
STATEMENT OF QUALIFICATIONS <br />JENNIFER MOORE I PUBLICWORKS INSPECTOR/TECHNICIAN <br />Ms. Jennifer Moore has more than 20 years of experience in construction quality <br />management, inspection and testing that spans a variety of high profile public <br />works projects. She has hands-on experience as an inspector and technician and has <br />progressively increased her level of responsibilities throughout her career. She has <br />in-depth knowledge of the standard tools and equipment utilized in construction <br />and in the sampling and testing of construction materials as well as knowledge of <br />mathematics and the methods used for computation of construction items. <br />RELEVANT PROJECT INVOLVEMENT/ EXPERIENCE <br />CITY OF POMONA ON -CALL, POMONA <br />Public Works Technician I Ms. Moore Services Quality Control Coordinator for the City of Pomona. RMA Group's services consist <br />of office research, field exploration, laboratory testing, review of the compiled data, and preparation of a written report containing <br />recommendations developed in accordance to generally accepted engineering and geologic principles and practices. <br />1-405 / SEPULVEDA PASS WIDENING PROJECT, LOS ANGELES <br />Public Works Technician I Ms. Moore's responsibilities included ensuring that the inspection and testing for the project were <br />completed in accordance with specified frequencies, overseeing the day-to-day construction quality by managing workmanship <br />inspections, overseeing production testing, and maintaining project inspection and testing documentation including filing daily <br />reports and coordinating monthly audits of quality assurance records by Department, State, and Federal oversight agencies. <br />Jennifer also ensured that all testing personnel and on and off -site field labs had current certifications as required, and that <br />materials incorporated into the work met the requirements of the contract documents. Hertesting and inspection services included <br />materials and laboratory testing of the embankment, MSE walls, aggregate base, asphalt concrete, Portland cement concrete, and <br />sub -grade, and inspection of roadway construction, bridge construction, and pile construction. <br />SR-71/ MISSION BOULEVARD INTERCHANGE, POMONA <br />Public Works Technician I Ms. Moore served as Quality Control Coordinator forthe SR-71 / Mission Boulevard Interchange Project. <br />RMA Group staff was responsible for all aspects of materials testing for the project. All staff assigned to the project were Caltrans <br />certified for the tests they performed. The number and types of tests required were determined in accordance with the current <br />Caltrans Construction Manual Chapter 6. Our staff performed all of their testing in accordance with Caltrans test methods. <br />NOGALES GRADE SEPARATION, CITY OF INDUSTRY <br />Public Works Technician I Ms. Moore served as Quality Control Coordinator for the Nogales Grade Separation Project. RMA Group <br />provided quality control services including the quality control manager, inspectors, and technicians to support the project. Our <br />quality control inspectors provided a full range of inspections including special inspection of reinforced concrete, welding, earthwork <br />and paving operations as well as electrical inspection for signals and rail systems. Our technicians performed field and laboratory <br />testing of soils, aggregate bases, ballast, portland cement concrete, and asphalt pavements. <br />1-15 / 1-215 DEVORE INTERCHANGE IMPROVEMENTS, SAN BERNARDINO COUNTY <br />Public Works Technician I Ms. Moore served as Construction Inspector for the 1-15 / 1-215 Devore Interchange Improvements <br />Project. RMA Group provided quality assurance testing of materials for this project including observation, inspection, and testing <br />of JPCP pavement (143,000-cy), structural concrete for CIP retaining walls (32,550-cy), Rapid Set Concrete (RSC - 22,000-cy), lean <br />concrete base, Hot Mix Asphalt pavement (63,000 tons), testingfor relative compaction of 1.8 million cubicyards of embankment, <br />24,000 cubic yards of structure backfill, and compaction and corrosion testing of MSE wall backfill, tension and bend testing <br />of reinforced steel, and inspection and testing of 3,400 soil nails. In total, there were 10 bridge reconstructions and five new <br />constructions. <br />STATE ROUTE 210, SEGMENTS 9, 10, & 11 AND SEGMENT 11 EARLY PROJECTS, SAN BERNARDINO COUNTY <br />Public Works Technician I Ms. Moore's responsibilities included ensuring that the inspection and testing for the project were <br />completed in accordance with specified frequencies, overseeing the day-to-day construction quality by managing workmanship <br />inspections, overseeing production testing, and coordinating regularly with the Resident Engineer for inspection of highway <br />construction for the four segments undergoing concurrent construction. Jennifer also maintained project inspection and testing <br />documentation, filed daily reports in accordance with the Department Construction Manual, and coordinated monthly audits of <br />quality assurance records by Department, State, and Federal oversight agencies. <br />CITY OF SANTA ANA I PUBLIC WORKS GEOTECHNICAL ENGINEERING SERVICES <br />Page 10l uLv Lz, zo16 E <br />1s-losz-P RMA Group <br />vcryProjecl Matters www.rmacompanies.com <br />