Laserfiche WebLink
STATEMENT OF QUALIFICATIONS <br />SCOTT McCREARY 1 PUBLIC WORKS INSPECTOR/TECHNICIAN <br />Mr. Scott McCreary has more than 13 years of inspection experience as well as a vast <br />knowledge of Quality Control Inspection and laboratory testing. He brings extensive <br />experience as a field supervisor managing quality assurance and quality control for <br />large, complex construction projects, in both heavycivil and commercial environments. <br />He has managed the up to thirteen QC inspectors engaged in a wide variety of large <br />scale paving, public works, structural and heavy civil projects. Has progressive software <br />skills and utilizes electronic data record keeping. In the QC role he has completed <br />documentation of requests for clarification, information, and contract changes. Scott <br />has researched and formally responded to all QC and compliance communications with <br />the Construction Manager. He has worked on a wide range of projects including light <br />rail transit, water / waste pipelines and facilities, highways, roadways, schools, and <br />building facilities in both public and private sectors. <br />Scott's experience allows him to provide a very high level of continuity to the project <br />by providing multiple inspections without substitutions. With his diversity, Scott is an <br />asset to any inspection team. <br />RELEVANT PROJECT INVOLVEMENT/ EXPERIENCE <br />PLACENTIA AVE GRADE SEPARATION, FULLERTON <br />Public Works Special Inspector/ Technician I Mr. McCreary sampled concrete, documented mix design, and placement forvarious <br />areas of project. The project constructed a vehicle underpass at the intersection of Placentia Avenue and the BNSF railroad. As part <br />of the project, the roadway will be lowered to separate car traffic from train traffic. RMA Group services included concrete and <br />welding inspections of roadway, bridge, pile construction, and tranch backfili observation. <br />KRAEMER AVENUE GRADE SEPARATION, PLACENTIA <br />Public Works Special Inspector / Technician I Mr. McCreary serves as Deputy Inspector for the Kraemer Avenue Grade Separation <br />Project. The project consists of a one -million -pound structural steel underpass bridge for the BNSF rail line and lowering Kraemer <br />Boulevard and Crowther Avenue by approximately 25 feet. In order to house the underpass, 130,000 cubic yards of excavation and cast - <br />in -place and secant pile retaining walls using 4,000 cubic yards of structural concrete and 31,000lineal feet of concrete piling are required. <br />EXPO LINE LRT PHASE 1, CULVER CITY AND SANTA MONICA <br />Public Works Special Inspector / Technician I Mr. McCreary was responsible for quality control testing for hot -mix asphalt, <br />aggregate base course, subbase course, and subgrade. He performed testing during grading, mass reinforced concrete placements, <br />and concrete pavers. The Culver City station at Venice and Robertson Boulevard is an aerial structure consisting of post -tensioned <br />soffit and decks. The entire structure is supported by abutments utilizing CIDH pile foundation systems. <br />EXPO PHASE 2, CULVER CITY - SANTA MONICA <br />Public Works Special Inspector / Technician I Mr. McCreary coordinates daily assignment for RMA Group inspectors and reviews daily <br />reports of others. He confirms QC plan to plans with client QC Manager and is also responsible for completing inspection and testing <br />records utility trenches, utility relocation, backfill for bridge bents at Sepulveda Bridge, Olympic Bridge, and oversight inspection of <br />material received for rebar cages. Scott also sampled concrete and and inspected concrete placement for CIDH piles for Pico Ave bridge. <br />STATE ROUTE 125, CHULA VISTA <br />Laboratory and Field Inspector I This $775 million Design -Build Project consisted of a new 12 mile toll road from SR 905 to SR <br />54 and the gap / connectors to SR 54, which includes 23 bridge structures. Mr. McCreary provided comprehensive quality control <br />services including materials sampling, testing and inspection, source inspection, structural inspection and testers, utilizing facilities <br />of four on -site laboratories specifically setup for the project. Scott's project role was Laboratory and Field Inspector, <br />NRG EL SEGUNDO ENERGY CENTER, EL SEGUNDO <br />Public Works Special Inspector/ Technician I Mr. McCreary sampled concrete, documenting mix design, and placement for various <br />areas of project. This project consists of the replacement of two existing steam generating electric generation units. Three new, <br />state-of-the-art, natural gas -firing, high efficiency, low emissions, combined cycle electric units (Units 5, 6, and 7) will be built in the <br />area where two unites were demolished. <br />\ CITY OF SANTA ANA I PUBLIC WORKS GEOTECHNICAL ENGINEERING SERVICES �+ <br />Page 16I f U LY 12, 2018 1 18-1052-P RMA Group <br />Every!'rojeU Matters I www.rmacomponies.mm <br />