STATEMENT OF QUALIFICATIONS
<br />SCOTT McCREARY 1 PUBLIC WORKS INSPECTOR/TECHNICIAN
<br />Mr. Scott McCreary has more than 13 years of inspection experience as well as a vast
<br />knowledge of Quality Control Inspection and laboratory testing. He brings extensive
<br />experience as a field supervisor managing quality assurance and quality control for
<br />large, complex construction projects, in both heavycivil and commercial environments.
<br />He has managed the up to thirteen QC inspectors engaged in a wide variety of large
<br />scale paving, public works, structural and heavy civil projects. Has progressive software
<br />skills and utilizes electronic data record keeping. In the QC role he has completed
<br />documentation of requests for clarification, information, and contract changes. Scott
<br />has researched and formally responded to all QC and compliance communications with
<br />the Construction Manager. He has worked on a wide range of projects including light
<br />rail transit, water / waste pipelines and facilities, highways, roadways, schools, and
<br />building facilities in both public and private sectors.
<br />Scott's experience allows him to provide a very high level of continuity to the project
<br />by providing multiple inspections without substitutions. With his diversity, Scott is an
<br />asset to any inspection team.
<br />RELEVANT PROJECT INVOLVEMENT/ EXPERIENCE
<br />PLACENTIA AVE GRADE SEPARATION, FULLERTON
<br />Public Works Special Inspector/ Technician I Mr. McCreary sampled concrete, documented mix design, and placement forvarious
<br />areas of project. The project constructed a vehicle underpass at the intersection of Placentia Avenue and the BNSF railroad. As part
<br />of the project, the roadway will be lowered to separate car traffic from train traffic. RMA Group services included concrete and
<br />welding inspections of roadway, bridge, pile construction, and tranch backfili observation.
<br />KRAEMER AVENUE GRADE SEPARATION, PLACENTIA
<br />Public Works Special Inspector / Technician I Mr. McCreary serves as Deputy Inspector for the Kraemer Avenue Grade Separation
<br />Project. The project consists of a one -million -pound structural steel underpass bridge for the BNSF rail line and lowering Kraemer
<br />Boulevard and Crowther Avenue by approximately 25 feet. In order to house the underpass, 130,000 cubic yards of excavation and cast -
<br />in -place and secant pile retaining walls using 4,000 cubic yards of structural concrete and 31,000lineal feet of concrete piling are required.
<br />EXPO LINE LRT PHASE 1, CULVER CITY AND SANTA MONICA
<br />Public Works Special Inspector / Technician I Mr. McCreary was responsible for quality control testing for hot -mix asphalt,
<br />aggregate base course, subbase course, and subgrade. He performed testing during grading, mass reinforced concrete placements,
<br />and concrete pavers. The Culver City station at Venice and Robertson Boulevard is an aerial structure consisting of post -tensioned
<br />soffit and decks. The entire structure is supported by abutments utilizing CIDH pile foundation systems.
<br />EXPO PHASE 2, CULVER CITY - SANTA MONICA
<br />Public Works Special Inspector / Technician I Mr. McCreary coordinates daily assignment for RMA Group inspectors and reviews daily
<br />reports of others. He confirms QC plan to plans with client QC Manager and is also responsible for completing inspection and testing
<br />records utility trenches, utility relocation, backfill for bridge bents at Sepulveda Bridge, Olympic Bridge, and oversight inspection of
<br />material received for rebar cages. Scott also sampled concrete and and inspected concrete placement for CIDH piles for Pico Ave bridge.
<br />STATE ROUTE 125, CHULA VISTA
<br />Laboratory and Field Inspector I This $775 million Design -Build Project consisted of a new 12 mile toll road from SR 905 to SR
<br />54 and the gap / connectors to SR 54, which includes 23 bridge structures. Mr. McCreary provided comprehensive quality control
<br />services including materials sampling, testing and inspection, source inspection, structural inspection and testers, utilizing facilities
<br />of four on -site laboratories specifically setup for the project. Scott's project role was Laboratory and Field Inspector,
<br />NRG EL SEGUNDO ENERGY CENTER, EL SEGUNDO
<br />Public Works Special Inspector/ Technician I Mr. McCreary sampled concrete, documenting mix design, and placement for various
<br />areas of project. This project consists of the replacement of two existing steam generating electric generation units. Three new,
<br />state-of-the-art, natural gas -firing, high efficiency, low emissions, combined cycle electric units (Units 5, 6, and 7) will be built in the
<br />area where two unites were demolished.
<br />\ CITY OF SANTA ANA I PUBLIC WORKS GEOTECHNICAL ENGINEERING SERVICES �+
<br />Page 16I f U LY 12, 2018 1 18-1052-P RMA Group
<br />Every!'rojeU Matters I www.rmacomponies.mm
<br />
|