My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RMA GROUP
Clerk
>
Contracts / Agreements
>
R
>
RMA GROUP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2019 8:38:27 AM
Creation date
12/7/2018 4:42:33 PM
Metadata
Fields
Template:
Contracts
Company Name
RMA GROUP
Contract #
A-2018-257
Agency
PUBLIC WORKS
Council Approval Date
11/20/2018
Expiration Date
11/19/2021
Insurance Exp Date
10/1/2019
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATEMENT OF QUALIFICATIONS <br />RODGER LITTLE I PUBLIC WORKS INSPECTOR/TECHNICIAN <br />Mr. Rodger Little brings a comprehensive knowledge of the construction industry having <br />spent more than 20 years as an ICC certified special inspector. His project experience <br />includes public facilities, high-rise, commercial, industrial, and retail buildings. <br />As a Lead Inspector, Rodger successfully supervises the inspection efforts of others <br />while also contributing as a special inspector. He is able to work independently and <br />problem solve in the field which is critical on a large project that requires the lead to <br />coordinate with the owner, the laboratory and his inspection team. This compliments <br />Rodger's communication, technical knowledge, and organization skills. <br />RELEVANT PROJECT INVOLVEMENT/ EXPERIENCE <br />PRESBYTERIAN INTERCOMMUNITY HOSPITAL, WHITTIER <br />OSHPD Inspector I Mr. Little provided inspection services for this five - <br />story surgery plaza tower. As the OSHPD Inspector for the project, Rodger <br />provided structural testing, inspection and observations (TIO), structural <br />tie-in with an underground soldier beam retaining wall system, observed and inspected <br />the application of spray -applied fireproofing material to the structural building frame, <br />and supervised the installation of structural drilled -in -anchors. <br />FONTANA MEDICAL CENTER [KAISER FOUNDATION HEALTH], FONTANA <br />Deputy Inspector I Mr. Little provided special inspection for the replacement of air <br />handling units (AHU) 1, 2, 3, and 4 for this medical center complex. Rodger performed <br />soils testing, reinforced concrete testing and inspection of reinforcing steel and pour op- <br />erations,and inspections of post -installed anchors, high strength bolting, spray -applied <br />fireproofing, and field and shop welding of structural steel elements. <br />WOODLAND HILL MEDICAL CENTER [KAISER FOUNDATION HEALTH], WOODLAND HILLS <br />Deputy Inspector I Mr. Little provided special inspections for this project that upgraded the existing hospital pneumatic tube delivery <br />system. Rodger provided AWS-compliant field welding inspection of tubing used for this upgrade. RMA Group additionally provided <br />materials testing and inspection for drill in anchors / dowels and pull load testing of epoxy dowels for the installation of equipment. <br />This particular project is part of a larger project that is renovating, remodeling and upgrading the entire Woodland Hills Medical <br />Center complex. <br />KTML MEDICAL OFFICE BUILDING 2, TEMECULA <br />Deputy Inspector I Mr. Little provided compaction testing for grading operations and field welding inspection of structural steel elements <br />for this office building project. The project services provided by RMA Group personnel included the aforementioned compaction testing <br />of soils, asphalt batch plant inspections, structural steel welding (field and shop), NDTtesting of steel elements, reinforced concrete and <br />reinforcing steel inspection and testing, drill in anchor / dowels testing, pull load testing, and having geotechnical engineering staff serve <br />as Geotechnical Engineer of Record for the project to build a new office building for the complex site. <br />VALLEY PRESBYTERIAN HOSPITAL, VAN NUYS <br />Public Works Special Inspector/Technician I Mr. Little provided inspection for the Plaza Tower I and II Retrofit of this medical facility <br />Inspected the preparation and installation of High Strength Epoxy into existing damaged shear walls. <br />KAISER PERMANENTE HOSPITAL, HOLLYWOOD <br />Public Works Special Inspector/ Technician I Mr. Little provided quality control of reinforced concrete shear walls and slab on grade <br />for this five -story medical building. <br />SAN DIEGO STATE UNIVERSITY, SAN DIEGO <br />Deputy Inspector I Mr. Little provided special inspection of the underground steam and storm system retrofit as well as the high- <br />pressure steam installation and drinking system chlorination. <br />PARKING STRUCTURE HOAG HOSPITAL, NEWPORT BEACH <br />Special Inspector I Mr. Little provided quality control of reinforced and prestressed concrete used in the construction of this parking <br />garage. <br />RMA GiOLI�% CITY OF SANTA ANA I PUBLIC WORKS GEOTECHNICAL ENGINEERING SERVICES Page 17 <br />Every Project Matters l www.rmacompanies.com JU LY 12, 2018 1 18-1052-P g <br />
The URL can be used to link to this page
Your browser does not support the video tag.