My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RMA GROUP
Clerk
>
Contracts / Agreements
>
R
>
RMA GROUP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2019 8:38:27 AM
Creation date
12/7/2018 4:42:33 PM
Metadata
Fields
Template:
Contracts
Company Name
RMA GROUP
Contract #
A-2018-257
Agency
PUBLIC WORKS
Council Approval Date
11/20/2018
Expiration Date
11/19/2021
Insurance Exp Date
10/1/2019
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATEMENT OF QUALIFICATIONS <br />IMPLEMENTING STAFF <br />After the City has reviewed and approved the task <br />order proposal, we will set the contract up in our project <br />management software as a new project and key team <br />members will be notified. The next step is to wait until <br />inspection and testing requests are received from the <br />City. The City will communicate inspection and testing <br />requests directly to our project manager and field director. <br />The RMA Group team will review the request and decide <br />which inspector or technician is best suited for the work <br />and for the project, and whose personality will be most <br />likely to fit in with other project team members. <br />RMA Group employs more than 160 certified <br />technicians and inspectors locally and more than 200 <br />overall who hold licenses and certifications to perform <br />inspection and materials testing. In the event that the <br />City is even remotely unsatisfied with the performance <br />or behavior of an RMA team member in the office, field, <br />or laboratory, that team member will be immediately <br />removed from further work on City projects and we <br />will have a discussion with the City on who will be best <br />suited to replace the individual and how we can identify <br />the specific problem and implement practices to avoid <br />similar problems in the future. With the large size of our <br />staff, there will be no delay in finding replacements for <br />any personnel who are removed from City projects. <br />The individual, or multiple individuals if necessary, <br />assigned to the projects will be entered by our dispatching <br />team into the field schedule of our Laboratory Information <br />Management System (LIMS) software. The software will <br />automatically send a pre -formatted daily inspection report <br />to the email address of the scheduled personnel, who are <br />also notified by phone call of their reporting instructions. <br />Typically, the personnel will also communicate with the <br />project manager to review project -specific requirements <br />and expectations. <br />RMA Group constantly invests in educating our <br />inspectors and technicians to be fully certified in many <br />of the different phases of construction. This provides a <br />continuity of personnel during all phases of construction <br />that enables them to have a broadened range of project <br />understanding. Our special inspection services include, <br />but not limited to, the following. <br />• Reinforced Concrete <br />• Post Tensioned Concrete <br />• Structural Masonry <br />• Wood and Timber Construction <br />.M <br />RMA Group <br />EveryProjeit Matters l www.rmocomponies.com <br />• Seismic Retrofit Inspections <br />• Soil Compaction <br />• Asphaltic Concrete <br />• Shotcrete <br />• Structural Steel, Welding Inspection <br />& Testing <br />• Materials Testing <br />• Shop Fabrication QC Audits (Source) <br />• Fireproofing & Coatings <br />• High Strength Bolting <br />• Roofing Inspection <br />• Torque & Pull Testing <br />• Floor Flatness Testing <br />• Floor Level Survey <br />• Glu-Laminated Inspections <br />• Shear Wall Nailing & Bolting <br />Inspections <br />Services shall be performed as requested by the City <br />and shall conform to the contract documents, The City <br />of Santa Ana Municipal Code (SAMC), professional <br />Standards established by the City, and or federal, <br />state and local guidelines established in the project. <br />DOCUMENT CONTROL <br />In the eventthat personnel are scheduled forworkthat <br />was not included in the original task order proposal, <br />our proprietary software will send an automatic email <br />notice to the project manager and key team members. <br />This instant notification allows for rapid communication <br />between RMA Group and the City to guarantee that <br />any work outside the original scope will be agreed <br />upon before it happens. It is a proactive approach to <br />project management that allows us to discuss and <br />resolve extra work or change order issues before they <br />become a problem. <br />RMA Group field personnel will arrive on site with their <br />daily report, certifications, equipment and safety gear, <br />and instructions from the project team. Field personnel <br />work will vary drastically depending on the type of <br />project and which elements are being inspected or <br />tested, but they will always fill out their daily report <br />after the work is complete and have it signed by an <br />authorized representative on site. <br />This allows any discrepancies in time worked or issues <br />encountered on site to be resolved on the project site, <br />CITY OF SANTA ANA I PUBLIC WORKS GEOTECHNICAL ENGINEERING SERVICES I Page 21 <br />JULY 12, 2018 1 18-1052-P <br />
The URL can be used to link to this page
Your browser does not support the video tag.