My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
MARKETING POWER, INC dba ENERGY RETROFIT, CO.
Clerk
>
Contracts / Agreements
>
M
>
MARKETING POWER, INC dba ENERGY RETROFIT, CO.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2019 1:02:16 PM
Creation date
1/14/2019 12:59:55 PM
Metadata
Fields
Template:
Contracts
Company Name
MARKETING POWER, INC dba ENERGY RETROFIT, CO.
Contract #
A-2018-260
Agency
FINANCE & MANAGEMENT SERVICES
Council Approval Date
11/20/2018
Expiration Date
3/29/2019
Insurance Exp Date
1/1/1900
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UTC Aerospace <br />55% Annual Energy Savings <br />PROJECT DESCRIPTION <br />UTC Aerospace awarded a design -build contract to Install new LED lighting to improve safety in the "high traffic" <br />areas surrounding the exterior areas on their 184cre Riverside campus. Because of the dramatic improvement in <br />exterior lighting; UTC management requested that ERC perform additional upgrades in critical interior work <br />environments, including the Airbus airplanes assembly building. <br />®„®„ _, Pro ect Images <br />SCOPE OF WORK <br />• Designed & Installed now LED lighting throughout the campus. <br />✓ The retrofit exterior solution included the replacement of all High -Pressure Sodium lighting with LED <br />✓ Lighting design ,software, (AG132) was used to ensure that neve lighting would be significantly Improved in all <br />areas <br />• New LED High Bay fixtures were Installed to replace T5 Fluorescent in the Airbus assembly building <br />✓ Overall reduction of $5% in energy use. <br />✓ Total project cost= $550,000 (additional work ongoing) <br />PROJECT CHALLENGES &. SOLUTIONS <br />✓ The outdated Hlgh�Pressura Sodium lighting offered poor light quality and coverage UTC management had <br />deemed the roadways on the property to be unsafe for employees. <br />✓ New LED Area lights, Flood lights, and Wail packs were Installed throughout the campus dramatically <br />improving light output and coverage, Improving overall visibility and safety. <br />✓ Our Team designed a Minh Bay LED solution for the Airbus assembly area to both improve light levels and <br />Incorporate O.10V dimming technology to allow the assembly technicians to dim the Ilghting during a <br />process that requires the use of lasers to guide them when assembling critical components of the aircraft, <br />d ENERGY RETPEIRT rte. <br />x"wnw �um�s':+w.yum,.u. 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.