Laserfiche WebLink
Exhibit A-1 <br />Change Order 2017-289-1 <br />;ff4 <br />City of Santa Ana <br />To: Otto Laufer <br />Cc: Michael Dietsch, Hiram Uribe <br />Michael Dietsch /William Leclerc <br />Siemens <br />Southern California <br />Project#: 44op-231411 Madison and Windsor Parks Security <br />Change Order #t : City of Santa Ana - Windsor Park -Centennial Park Radio <br />Please see Change Order request details below for out <br />The installation at Windsor Park was as per initial scop <br />installation of a non -penetrating roof structure on the <br />roof. This structure had been planned to avoid having <br />allow mounting of the radio antennas to create a Vill <br />After Siemens provided all the requested documen% <br />review it, the permission was never granted <br />Siemens had to provide the City of <br />link between City Hall and Windsor <br />to the school roof, and to <br />City Hall to Windsor park. <br />School I School board to <br />fabrication and delivery was at minimum tt weeks. <br />7cic ori might have created issues with residences close by pole (esthetics). <br />Tedical feasibility, due to presence or trees and electrical cables in the proximity of <br />the potential location posed a risk for logistics. <br />Solution 2 was declined. <br />Unrestricted SOW Page 1 1 <br />