SIpr �r Michael Dietsch {William Leclerc <br />CC Siemens <br />Southern California <br />Cable Company would have requested monthly fee to the CoSA for using the <br />network. <br />Very long lead time was associated with this option (from 6 months to i year). <br />Solution 3 was retained by both Siemens and the CoSA: <br />- It is the most affordable. <br />It brings added benefits to the CoSA by bringing network connectivi o Ce nnial <br />Park for potential future project. <br />Material delivery doesn't pose a risk. UN <br />Solution 3 - Change Order Request Scope of Work <br />In order to execute the engineering, procurement, fns &tIon, to and commissioning <br />of adding a radio link between City Hail, centennial ar park, Siemens has already <br />spent and will have to spend additional hours tofr izegineering, procure additional <br />material and incur additional installation c per o g Scope of Work (see Map i and <br />Map 2 below): <br />Wln ;xor Pa iLc. <br />• Use of existing sidewalk li e er Photo i below and add pole extension to <br />mount two (2) Siklu r <br />• Trenching (includi re 'n d repairing concrete if needed) from existing light <br />pole to Winds Idi . Install conduit and pull power and network cable. <br />• Procure, l , a commission two (2) new Siklu Radio antenna and mist. <br />materia1g e o Centennial Park); <br />soccer field light pole as per Photo 2 below. <br />• Mod1y existing 120 vat outlet located at bottom of pole (see Photo 3 below) to tap <br />power and bring it to the top of the pole. <br />• Rent a boom lift for i week to install material on pole, test and commission two (2) <br />Radio links, one (i) from City Hall to Centennial and one (1) from Centennial to <br />Windsor. <br />• Procure and install new Sikiu Radio antenna, Nema 4 enclosure, PoE switch and mist <br />Unrestricted SOW Page 12 <br />