Laserfiche WebLink
SIEMENS <br />boxes with dirt and a 1" slurry cover after the final inspections. <br />• Trench a minimum of 2 ft. deep between the light pole and the Code Blue Tower base. Place <br />in the trench PVC conduit and wire for 120vac 20 amp power for the Code Blue Tower <br />receptacle. Verify circuit Is in proper working order, Install new 20 amp circuit if required. <br />Keep power for scoreboard, <br />• Instaliconcrete base 24"base x36"deep, insure concert base is sloped to for water to run <br />off from CodeBlue Tower, <br />• Install CodeBlue tower on concrete base <br />• Install 110VAC quad outlet to base of CodeBlue Tower. <br />• Siemens shall mount all cameras (one (1) PTZ and one (1) 360 deg camera) on CodeBlue <br />Tower. <br />7. .o... $e' 1411Ta <br />• Install on the roof edge one custom pole mount <br />• Pole mount one (1) outdoor PTZ camera. <br />• Pole mount one (1) outdoor loud speaker. <br />• Pole mount one (1) Ubiquity radio link pointed at the high pole west of the scoreboard <br />radio link, <br />• Install one (1) NEMA enclosure Inside the building. <br />• Install equipment power supplies and one (1) PoE Switch in the enclosure. <br />• Install a 120vac quad outlet In the enclosure connected to the closest 120vac power source <br />Inside the building, <br />• Install Cath OSP cabling for all outdoor equipment <br />Additionalinstallation Requirements: <br />1, All required fire stopping shall be UL listed 3M Fire barrier Caulk or 4hr, UL rated <br />equivalent is required. Retain one (1) used cartridge for documentation. <br />2. Each poleand field enclosure location shall be interconnected via conduit <br />3. All outdoor equipment shall be weather proofed to protect devices, cabling and structures <br />from the outdoor elements. <br />4. All risers and lateral connections into the field enclosures, both Security and IT/Telecom <br />enclosures shall be schedule 80 rigid steel construction. <br />S. Conduit elbows may be schedule 80 PVC construction, assuming the connection to steel <br />risers occurs within the concrete foundation, Any conduit elbows that are not embedded <br />within a concrete foundation shall be schedule 80 and rigid steel construction, <br />6, All above ground conduit shall be galvanized rigid steel unless otherwise noted. <br />7. Conduit runs shall allow for 50% additional capacity. All conduits shall have a "pull string" <br />Installed and remain for future use. <br />B. All work shall meet or exceed the latest requirements of all national, state, county and <br />municipal codes. <br />9. All required permits and inspection certificates shall be provided by others. <br />10. All work shall conform to the National Electrical Code, National Fire Codes, N PPA Life Safety <br />Code and other local codes. <br />Page 13 <br />