Laserfiche WebLink
Exhibit A-5: Second Amendment to MSA <br />(A-2017-289) <br />SIEMENS <br />January 15, 2019 <br />City of Santa Ana <br />Parks & Recreation - Multisite Site Project <br />Description of Work: Contractor is to provide electrical, lowvoltage and concrete contracting <br />services for City of Santa Ana park security enhancement projectthat include the following sites: <br />1. Chepas Park <br />2. jeromePark <br />3. Santa Anita Park <br />4. Memorial Park <br />Statement Of Work: <br />The below scope of work and cost reflects changes thatoccurred in scope of work and cost since <br />May 8 2018. Work shall Include the following: <br />SMUADUfalk <br />Furnish and install 7 outdoor IP cameras, 3 outdoor IF SIP loud speakers, i server, I PoE network <br />switch,1 vertical wall mounted server rack, all associated cabling, associated powersupplies and <br />programming, per the following: <br />Recreation/CommunityC at rRuildili <br />• Install seven (6) outdoor fixed cameras mounted on the building, viewing the surround <br />park and restrooms entrance. <br />• Install EMTconduiton the exterior of the building roof top areas. <br />• Install three (3) outdoor loud speakers mounted on the building. <br />• Install one (1) outdoor PTZ camera on a custom buiitfence pole extension at the rear of the <br />swimming pool fence line corner. Install rigid conduit on the upper fence line from the PTZ <br />camera to the building. <br />• The Parks Dept, will modify a fence gate to accommodate the new conduit path above the <br />gate. <br />• Install inside the building electrical room on a fire rated backboard, a vertical low profile <br />IDF enclosure, server, PoE switch and other miscellaneous items inside the enclosure. <br />Provide inside the IN enclosure a 120vac quad outlet on a dedicated 20amp circuit. <br />• Install Cath OSP cable for all outdoor equipment. <br />• Connect to the city network switch. <br />Additional Installation Requirements: <br />1. All required fire stopping shall be UL listed 3M Fire barrier Caulk or 4hr, UL rated <br />equivalent is required. Retain one (1) used cartridge for documentation. <br />2. Each pole and field enclosure location shall be interconnected via conduit. <br />Page 11 <br />