My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SIEMENS MASTER SERVICES
Clerk
>
Contracts / Agreements
>
S
>
SIEMENS MASTER SERVICES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2019 11:18:01 AM
Creation date
3/25/2019 12:36:45 PM
Metadata
Fields
Template:
Contracts
Company Name
SIEMENS MASTER SERVICES
Contract #
A-2019-035
Agency
POLICE
Council Approval Date
3/5/2019
Expiration Date
11/8/2020
Insurance Exp Date
10/1/2019
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SIEMENS <br />3. All outdoor equipment shall be weather proofed to protect devices, cabling and structures <br />from the outdoor elements, <br />4. All risers and lateral connections Into the field enclosures, both Security and IT/Telecom <br />enclosures shall be schedule 80 rigid steel construction. <br />S. Conduit elbows may be schedule 80 PVC construction, assuming the connection to steel <br />risers occurs within the concrete foundation. Any conduit elbows that are not embedded <br />within a concrete foundation shall be schedule 80 and rigid steel construction. <br />6. All above ground conduit shall be galvanized rigid steel unless otherwise noted. <br />7. Conduit runs shall allow for 50% additional capacity. All conduits shall have a "pull string" <br />installed and remain for future use. <br />B. All work shall meet or exceed the latest requirements of all national, state, county and <br />municipal codes. <br />9. All required permits and inspection certificates shall be provided by others. <br />10. All work shall conform to the National Electrical Code, National Fire Codes, NFPA Life Safety <br />Code and other local codes. <br />General Terms & Conditions: <br />11. Prior to any daily work being conducted, a safety tailboard meeting shall be conducted with <br />all contractors and site personnel. This training will be re -conducted every time there are <br />new personnel working on site. <br />12. All affiliates of the contractor shall dress in appropriate work attire bearing their respective <br />company logo for recognition. When working at the Police Department all affiliates of the <br />contractor shall report to CDC, for sign in and temporary badging for the day. They must <br />also notify a Siemens and/or City's site representative every time they are to be on site. <br />Failure to adhere to the rules set forth in this and subsequent CoSA Issued documents <br />regarding security protocol shall be grounds for removal from the site. <br />13. The contractor shall be responsible for the cleanup at the site after each day of work. Failure <br />to adhere to workplace neatness shall be remedied at Siemens's expense and subtracted <br />from the overall cost of the project, <br />14. Work conducted at the site shall be coordinated in advance with the Siemens project <br />manager and on the site personnel/representative. Schedule and designated working <br />procedures will be adhered to unless otherwise agreed to by all parties in writing. <br />15. Existing Conditions: Prior to commencing work at site, verify the agreement of existing <br />conditions with indicated conditions. Notify the Siemens Project Manager of discrepancies <br />found. Start of work without notification constitutes acceptance of condition, without extra <br />cause for costs. <br />16. Discrepancies: Should any discrepancy exist on drawings or in the specifications, or <br />between the drawings and specifications, the contractor shall bring the discrepancy to the <br />attention of the Siemens Project Manager for clarification. <br />17. Construct barricades, lights, or other guards about the work area shall be supplied if <br />required by local ordinances or public safety and necessity, as related to this contract <br />Page 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.