Laserfiche WebLink
.� UIC <br />. e mneran or <br />Yaen Vaigz e,:rn oon"u"7ieioui <br />Project #: 81.207 B-D.1 <br />CHARGING UNIT INSTALLATION <br />Installation and commissioning of one (1) CT4000 dual -port charging station with Power Management <br />enabled. <br />o Power Management (Power -Sharing) Is featured software which allows one (1) dual -port <br />charging station to only require one dedicated circuit for both charging ports, This feature is <br />most beneficial for locations with limited electrical capacity as It allows the charging station to <br />divide charging capacity of one (1) circuit and dispense charge to two vehicles simultaneous, <br />While only a single vehicle is charging, the charging station will dispense charge at the maximum <br />possible output. <br />Supply and installation of one (1) 40A circuit breakers for EVCS overcurrent protection. <br />o Utilization of existing electrical panels to supply one (1) 30A circuit to new charging unit. <br />o From the electrical panel(s) to new charging station, the new electrical conductors: #g and #10 <br />ground wires, <br />PROVISIONS FOR FUTURE GROWTH <br />None <br />PARKING MODIFICATIONS <br />• Supply and installation of two (2) protective bollards. <br />a Supply and mounting of two (2) EV parking signs. <br />• Stenciling/marking "EV CHARGING ONLY" for two (2) EV parking spaces, <br />RELATED CONSTRUCTION WORT( <br />Core drilling, <br />• Placement of EMT, approximately+140'. <br />INITIALS DATE <br />.7- <br />1:Video ,.:.. _e Data Communications <br />�catiic Dl� . .1 12.f6 1 r . Drive, <br />Ga( z..u-v'.wmn �:.,+ a...iS�Cde�Pi y3�:aausuas��nc7m,;a._nr.,•�.�n <br />Video Voice Data Communications Voltaic Ulwsron 12681 Pala Drive, Garden Grove, CA 92841 Print Date. November 15, 2019 <br />