Laserfiche WebLink
a orvmnM nr <br />V,n6n VO,oC L]9iP pnMMYNIMfioHP <br />Project #: 81-2078-D.1 <br />2.420 N. Main Street <br />Location: 420 N. Main Street <br />Santa Ana, CA 92701 <br />N1PA #: OS1017-CPI <br />CHARGING V NIT MOVNTINGTYPE(s): WALL <br />TOTAL# OF PARKING FOR EV: Two <br />Price Breakdown: <br />Electrical/Construction, Labor and Material <br />EVCS Unit(s) and Service(s) <br />Total Price: <br />Electrical/construction. Labor and Material Includes: <br />$10,213.00 <br />$6,848.00 <br />$17,061.00 (tax included) <br />Proposal consists of project management and site planning, engineering and designing for any necessary <br />permit acquisitions. <br />o Permit acquisitions also include the plan checking, and inspection processes (not including <br />actual plan checkfee, permitting and/or Inspection fees) as required bythe authorities having <br />jurisdiction. <br />Perform Site Validation survey (SVS) as required by ChargePoint, Inc. prior to activation of units, SVS fee <br />to ChargePoint, Inc. discounted when using ChargePoint, Inc. Certified Installers, <br />o Standard electrical power consistency evaluation: circuit breaker and electrical panel evaluation. <br />o Cellular network communications test: test for consistency of cellular signal strength. <br />o Charging station evaluation: consistent voltage, amperage, ground, network communication, <br />ELECTRICAL EQui PMENT UPGRADE <br />None. <br />o Use two (2) available spaces in existing electrical panel "P1" <br />-6- <br />�ar+�:�....r mss�asmc�r.+ �. mz _s.as ut z v=zamax.�ax:r�,'*_m�;,_-Sw.L:�A'f'.:li•'�ia..sasi-.sra,�:az �x�.„�iv,:,�va smr:W�a..+w.s1+S.'Y='nu"ei�'�`+_=A <br />Video Voice Data Comm unlcations i Voltaic. Division 112681 Pala Drive, Garden Grove, CA 92841 Print Date: November 15, 2018 <br />