Laserfiche WebLink
�L�LTAIC <br />a orvmioX pe <br />Via[tl VtlihC WTh OCMM�XlatlnpNa <br />4.215 South Center Street <br />Location: 215 South Center Street <br />Santa Ana, CA 92703 <br />NJ PA d: 051017-CPI <br />CNAAGINO UNIT MOUNTING TYPE(S): WALL+BOLLARD <br />TOTAL# OF PARKING FOR EV: FOUR(4) <br />Price (Breakdown: <br />Project 81.207B-D.1 <br />Electrical/Construction, Labor and Material $17,943.00 <br />EVCS Unit(s) and Service(s) $13,695.00 <br />Total Price: $31,638.00 (tax Included) <br />Electrical Construction Labor and Material Includes: <br />Proposal consists of project management and site planning, engineering and designing for any necessary <br />permit acquisitions. <br />o Permit acquisitions also Include the plan checking, and inspection processes (not including <br />actual plan check fee, permitting and/or inspection fees) as required by the authorities having <br />jurisdiction, <br />Perform Site Validation survey (SVS) as required by ChargePoint, Inc. prior to activation of units, SVS fee <br />to ChargePoint, Inc. discounted when using ChargePoint, Inc. Certified Installers, <br />o Standard electrical power consistency evaluation: circuit breaker and electrical panel evaluation. <br />o Cellular network communications test: test for consistency of cellular signal strength. <br />o Charging station evaluation: consistent voltage, amperage, ground, network communication. <br />ELECTRICAL EDUIPMENT UPGRADE <br />0 None. <br />o Use eight (8) available spares/spaces in existing electrical panel "PD". <br />-12- <br />e.u' <br />Video Voice Data Communications I Voltaic Division 112682 Pala Diive, Garden Grove, CA 92841 Print Date. November 15, 201E <br />