Laserfiche WebLink
c LTA I C <br />.� plYlplgry pY <br />Np.. VOICE 5M1. iIpMMYNIe�Y1gHf <br />Project#, 81-207E-D,1 <br />CHARGING UNIT INSTALLATION <br />Installation and commissioning of two (2) charging units to meet NEC requirements. <br />Supply and Installation of four (4) 40A circuit breakers for EVCS overcurrent protection, <br />o Utilization of existing electrical panels to supply four (4) 30A circuits to new charging units. <br />o From the electrical panel(s) to new charging stations, the new electrical conductors: #6 and #10 <br />ground wires, <br />Forming and pouring of concrete pad of dimensions per manufacturer's specifications for charging unit <br />structural support. <br />PROVISIONS FOR FUTURE GROWTH <br />• None <br />PARKING MODIFICATIONS <br />• Supply and Installation of four (4) bolt -down bollards for charging unit protection. <br />• Supply and mounting of four (4) bolt -down steel sign posts with EV parking signage. <br />• Stenclling/marking "EV CHARGING ONLY" for four (4) EV parking spaces. <br />RELATED CONSTRUCTION WORK <br />• Core drilling. <br />• Placement of EMT, approximately+200', <br />• Trenching and/or pneumatic boring, approximately+30' <br />• Concrete (demolition and repair) <br />INITIALS DATE <br />-13- <br />.:..�.o c i Data <br />C:;��c..trrators � olta .,.I,ivisi <br />Video Voice Data Communications Voltaic DIVLJ00 112881 Pela Drive, Garden Grove, CA 92841 Print Data Novernber 15, 2018 <br />