Laserfiche WebLink
- C LTA I C <br />p mvmmry or <br />Mnen Vamv o...w 4oVnu.iew;;ox. <br />Projectk: 81.2078-D.1 <br />1.310 N. Birch Street <br />Location: 310 N. Birch Street <br />Santa Ana, CA 92701 <br />NJPA k: 051017-CPI <br />CHARGING UNIT MOUNTING TYPE IS): BOLLARD <br />TOTAL# OF PARKING FOR EV: TNO(2) <br />Price Breakdown: <br />Electrical/Construction, Labor and Material <br />EVCS Unit(s) and Service(s) <br />Total Price: <br />Electrical/Construction. Labor and Material Includes: <br />$9,601.00 <br />$7,409.00 <br />$17,010.00 (tax included) <br />Proposal consists of project management and site planning, engineering and designing for any necessary <br />permit acquisitions. <br />o Permit acquisitions also include the plan checking, and inspection processes (not including <br />actual plan check fee, permitting and/or inspection fees) as required by the authorities having <br />jurisdiction. <br />Perform Site Validation survey (SVS) as required by ChargePoint, Inc. prior to activation of units. SVS fee <br />to ChargePoint, Inc. discounted when using ChargePoint, Inc. Certified Installers. <br />o Standard electrical power consistency evaluation: circuit breaker and electrical panel evaluation. <br />o Cellular network communications test: test for consistency of cellular signal strength, <br />o Charging station evaluation: consistent voltage, amperage, ground, network communication. <br />ELECTRICAL EQUIPMENT UPGRADE <br />• None. <br />o Use two (2) available spaces in existing electrical panel "L" <br />-3- <br />__ <br />Video Voice Data Communications I Voltaic Division 112581 Pala Drive, Garden Grove, CA 92841 Print Date: November is, 2018 <br />