Laserfiche WebLink
VOLTAIC <br />I. pIVIIION p� <br />VIukO {�o,qp Glwfp {ipMMYNIOPiIpNk <br />Project#: 81.2078-D.1 <br />CHARGING UNIT INSTALLATION <br />Installation and commissioning of one (1) CT4000 dual -port charging station with Power Management <br />enabled, <br />o Power Management (Power -Sharing) is featured software which allows one (1) dual -part <br />charging station to only require one dedicated circuit for both charging ports, This feature is <br />most beneficial for locations with limited electrical capacity as it allows the charging station to <br />divide charging capacity of one (1) circuit and dispense charge to two vehicles simultaneous. <br />While only a single vehicle is charging, the charging station will dispense charge at the maximum <br />possible output. <br />Supply and installation of one (1) 40A circuit breakers for EVCS overcurrent protection. <br />o Utilization of existing electrical panels to supply one (1) 30A circuit to new charging unit, <br />o From the electrical panel(s) to new charging stations, the new electrical conductors: #6 and #10 <br />ground wires, <br />PROVISIONS FOR FUTURE GROWTH <br />• None <br />PARKING MODIFICATIONS <br />• Supply and installation of two (2) protective bollards, <br />• Supply and mounting of two (2) EV parking signs. <br />• Stenciling/marking "EV CHARGING ONLY" for two (2) EV parking spaces. <br />RELATED CONSTRUCTION WORK <br />• Core drilling. <br />• Placement of EMT, approximately+180'. <br />INITIALS DATE <br />.4- <br />Da,lkLF <br />Video Volce Data Communications I VoltalC Division 11268.1 Pala Drive, Garden Grove, CA 92841 Print Date. November 15, 2018 <br />