Laserfiche WebLink
AMI Feasibility Report I Client Name: City of Santa Ana <br />The AMI system will require procurement of new meters, communication modules to upgrade some <br />of the meters, installation of RF network, AMI software (head end system - HES), meter data <br />management system (MDMS) to store meter reads and the customer portal to provide data to <br />customers. The MDMS will provide data to the existing billing system. We recommend the city to <br />consider a hosted AMI HES, MDMS and customer portal solution as this will not put burden on City <br />IT department to install and manage these systems. The overall cost to manage these systems can <br />be comparable and even lower if City opts for a hosted solution. For the AMI RF network, City can <br />own the network and allow the vendor to manage it thereby eliminating the need for resources <br />with specific technology skills. City should validate these options and cost through request for <br />proposal (RFP) from AMI vendors. <br />A major goal of an AMI implementation is to offset some or all of the project costs with yearly cost <br />savings as a result of implementing the project. The major benefits of an AMI implementation are <br />derived through automation of business practices that are manual processes, meter accuracy, <br />improved billing practices and customer service. A high level benefits analysis was done that <br />shows total benefits over project life of $9,942,093. These estimates are based on the analysis of <br />information provided by the City and Black & Veatch's experience and industry knowledge. The <br />actual benefits will undoubtedly vary; additional benefit values will be experienced in some areas <br />and less in others. <br />Based on the recommendation for a hosted AMI solution, the total project cost (i.e., one-time costs <br />experienced during the course of the 3 year implementation period) is approximately $13,274,449 <br />million dollars. The estimated $3,384,405 million total recurring costs are those related to the <br />ongoing support of the AMI system over the 18 year project operating life, including both City and <br />vendor costs. This total estimated cost of ownership is $16,658,853 million. City has a budget for <br />currently replacing 1,500 meters per year. If this budget is taken into consideration for the project <br />duration of three years, then the cost of 4,500 meter replacement can be used towards the AMI <br />project thereby reducing the project cost. City staff will have to continue to seek funding for the AMI <br />initiative. <br />Black & Veatch recommends that the City should select an AMI program advisor and industry <br />consultants to assist in developing detailed requirements documentation to support the <br />procurements. The City should also constitute and engage a core AMI working group that has <br />representatives from throughout the City organization that can act as a conduit to provide <br />information to the team as well as communicate to their respective work groups. The AMI working <br />group and advisor should develop detailed strategy, design, and plans for AMI as well as support <br />the project management and implementation. <br />The business case for the City appears to be favorable since the City's major strategic goals: <br />enhanced customer service portal, customer water consumption data availability, distribution leak <br />detection system, smart water meters, monthly billing cycles and cash flow improvements can be <br />implemented by the AMI System. Additionally, there is an opportunity cost if the project is not <br />implemented as there will be ongoing investment in the current manual meter reading technology, <br />25G-120 <br />