2. Within a reasonable time prior to the start of any on -site work, delivery of materials, equipment, or personnel, Contractor will submit to
<br />Owner the following:
<br />A- A complete set of drawings approved by Owner and subsequently by the City in which the Building is located.
<br />B- A fully executed Indemnity Agreement (To Be Provided by Owner Upon Request),
<br />C- Certificate of Insurance lit a form approved by Owner executed by insurance companies acceptable to Owner.
<br />D- A fully executed Notification -Rules for Contractors (To Be Provided by Owner Upon Request).
<br />E- A job schedule of file work to be accomplished, detailed by trade.
<br />F- A complete list of all proposed Suheomraetors and suppliers, Owner -must approve all contractors and subcontractors before
<br />commencement of their work,
<br />O- The name slid phone num4er(hioludingemergency phone numbers) orpersonnel who are.authorized to represent the Contractor.
<br />3. No revisions or changes oran.y kind may made to the. construction_ plans previously approved by Owner without prior written consent of
<br />the Owner. Any proposed'�evisians or changes must be submitted to Owner in :the form of a change order, for Owner's review and
<br />approval prior to commo{tcement of "Such changes, Revisions or changes altering the floor plan, base :building systems, or building
<br />operations must. beIsabmitted, in writing, to the Owner for review and :approval prior to conuueinaement of work,
<br />4. All of Contractor's work must be scheduled so that it in no way conflicts with, interferes with, or impedes the quiet and, peaceful enjoyment
<br />of other tenants., or occupants of the Project, or with the progress of: Owner's won$ or operations Any work that is in conflict will be
<br />reschedu(od by the C'ontl•aatdi' to such time as approved by Owner, {additionally, Ovirier shall have he liability i'or any costs or expenses
<br />incurredbycontractor.(or Tenant) in connection with such rescheduling
<br />5. Contractor and subcontractors shall employ persons and means for the orderly progress of thework without interruption of account of
<br />strikes, work stoppages or similar causes of delay, AdBittonally, Owner snail have no liability for any costs or expenses incurred by
<br />Contractor (or Tenant) in. connection with such delays.
<br />6. Materials and toot storage will be limited to the areas for• which access hasbeco granted.
<br />7. Clean-up and rubbish removal shall he provided by the Contractor at Contractor's: expense: Contractor must, on a daily basis, remove all
<br />rubbish, surplus and waste material resulting from the perfttrmtlttee;.of Iris work; At the request of Owner, Contractor shall relocate any
<br />materials causing uu abstraction as directed by Owner. Contractor wfll not be allowed to place a dumpster on site Oil a continuous basis
<br />during 'consilletion. [.
<br />Important note:. The placement imd locaflon�of rubbish dumpslers and bills must be approved in advance by Owner.
<br />S. In general, Owner will interface with Contractor to the extent necessary for work to be completed within the guidelines of project
<br />specifications and fbr the enfoacenlent orbuilding rates and regulations:,
<br />9, Contractor will make arrangements for'.unloadmg, trash removal and hoisting after normal working (tours clue to the local city noise
<br />ordinance. (No such activity will be allowed between Che:hours of 10:00'o.m. to 7:00 a.m.) At no time will the Conti -actor be given
<br />exclusive reserved use of the-trcight elevator ❑bless applied for by Contractor and approved by Owner'.. Contractor may be afforded access
<br />to loading dock space and hoisting facilities for limited use at Such time during nonnat working hours as is prearranged: with Owner, or at
<br />other times, wtith the consent of Owiie• and upolt paymeneorOwner'"s prevailing fee for after-hours use and access. W. Contractor will be afforded unloading areas as prearranged with Ownter. ,All materials unloaded at these areas will be moved to an area of
<br />use immediately and shall not be stored or used in a way vhich udversely impacts use ofthe Building.
<br />I I. Contractor (and Tenant) will he responsible fib• the securfty,.of its Uwrt lnaterfnls, t4LIdpment and work, and that of his subcontractors.
<br />Contractor will also be responsible for danngc tons ud by Contractoror its subcontractors to the Project, Building and/or tenant areas,
<br />including, but not limited to the loading dock and indoor and outdoor; public areas, freight elevators, etc. Any such claniages will he
<br />promptly repaired to the Owneessatisfaction atsolc cost of Contractor.
<br />12, Contactor will comply with all applicable codes, laws and regulahons�pertiiinilg to�the work cl'Cuntracwr, including all safety and health
<br />regulations. The Contractor shall supply the D\Yaer with -a Master -List or fill Hazardous Materials and their Material Safety Data Sheets
<br />(MSDS) upon delivery to thejub site. A discussion will then ensue pertaining to the safe storage, handling and use of these materials. as
<br />well as the Contractor's emergency preparedness plan liar handling the containment and clean-up of potential Hazardous Material spills.
<br />13Contractor will not engage in any labor prmtfce that may delay or otherwise impact die work ofOwticr or any otter contactor.
<br />14. No base building systems will be turned oil' or disengaged by Cbnt•actm or any subcontractor without prior written approval aid
<br />supervision by u representative uFOwner or its agent. Said systems include but are not limited to spri nkle's. electricul circuits. air -handling
<br />units. smoke heads and water supply, Building electrical power shut -downs sue allowed, with the prior written consent ofowner. on
<br />Saturdays betwvecn 10:00 P.m. and 5:00 a.m. only. A request for approval shall be made to the Prnperty Manager at last ten ( 10) days in
<br />advance.