My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CALIFORNIA, STATE OF EMPLOYMENT DEVELOPMENT DEPARTMENT (2)
Clerk
>
Contracts / Agreements
>
C
>
CALIFORNIA, STATE OF
>
CALIFORNIA, STATE OF EMPLOYMENT DEVELOPMENT DEPARTMENT (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2020 8:39:57 AM
Creation date
5/29/2019 10:06:04 AM
Metadata
Fields
Template:
Contracts
Company Name
CALIFORNIA, STATE OF EMPLOYMENT DEVELOPMENT DEPARTMENT
Contract #
A-2019-072
Agency
COMMUNITY DEVELOPMENT
Council Approval Date
5/7/2019
Expiration Date
6/30/2023
Destruction Year
2028
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
130
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15. Poors to all workareas, including stairwells and mechanical and electrical closets, will remain closed at all tine. Propping doors open is <br />expressly prohibited. <br />16, All Contractor and subcontractor personnel, materials, tools and equipment are to enter and exit the Building through the service elevator <br />only. Owner may at any time initiate a check in/check out system, or a badge system, for all people and4nalerial in the Building and the <br />Contractor will agree to cooperate with any such system. <br />17. Before ordering material or doing work which is dependent upon proper size or installation, the Contractor shall field verify all dimensions <br />for accessibility with building conditions, and shall be responsible for same. <br />18. Contractor shall not permitted any identifying signage or advertising within the Project or Building. <br />19. During construction, Contractor shall maintain supervisory personnel on die site at all limes. Such personnel shall be fully aufliorized to <br />coordinate, respond for and authorize Contractor's work as necessary so as to enable all work to proceed in a timely and well -ordered <br />fashion. Should Contractor perform work which would cause or require Owner to provide personnel to be present or otherwise perform <br />any work, Contractor shall reimburse Owner for the expense of such personnel, <br />20. Contractor shall be responsible for the protection of its work and the area adjacent to his work. <br />21, Connector will ensure that all stairwells, mechanical rooms, electrical and telephone closets, etc. accessed by Contractor or subcontractors <br />in conjunction with Contractor's work, will be cleaned and five of debris nightly. <br />22, Public areas adjacent to premises where Contractor's work is being performed shall remain free of debris and materials at all times. <br />23. Contractor shall be responsible for all his actions on site as well as those of its subcontractors, and shall indemnify, defend and hold <br />harmless the Owner and the other Owner Parties from and against any and all claims, losses, or damages, threatened or incurred, arising <br />from fhc actions or omissions of Contractor or its subcontractors. <br />24. If keys are required by contractor, they must be checked out from the Property Management Office. No key will be distributed if proper <br />identification is not provided. <br />25. No cutting or patching of Owner's premises or installations, or those of any Building occupant, shall be permitted without the prior written <br />consent of Owner. Request for permission to do cutting shall include explicit details and description of work and shall not under any <br />circumstances diminish the structural integrity of the Building or the integrity of any of components or systems. The work is to be done <br />only with the explicit written permission of die Property Manager, find only on an "Olf-Hours" basis. Such work is to be done only under <br />the direct supervision of a competent member of the Contractor staff. Any such area is to be promptly repaired and returned to a fully <br />functioning, complete, and clean condition. <br />26. All work is to be done to a minimum standard of quality as required by the Base Building Drawings and Specifications (to be made <br />available by Owner upon request). It is the responsibility of the Contractor to be rally knowledgeable of the Base Building Drawings and <br />Specifications. <br />27. All Life Safety Systems for the Building ere to be maintained, and all of the Tenan Ps work is to be properly interfaced with and connected <br />to the Base Building systems as required by Laws, or by Building operation. All work is to be done in such a way as to protect all Base <br />Building operations and warranties. Any required disconnection of life safety devices should be "foreseen" and the Property Management <br />Office must be notified at least 24 hours in advance. Costs for false fire alarms clue to contractors' or subcontractors' negligence will be <br />billed to and paid by the Contractor. All life -safety systems testing must be performed on an "after-hours" basis and coordinated with the <br />Building Manager. <br />28, When work is performed by Contractor or subcontractor, charges will apply for additional services performed by Owner which may <br />include, but are not necessarily limited to the following: <br />A - overtime or after-hours elevator usage <br />B - utility usage far construction activities beyond standard power and water used in connection with general office uses <br />C - extra and continuous clean-up of elevators and public spaces as required due to construction activity; Contractor to provide the <br />usual protection of existing improvements, and exercise care tnnd good sense <br />D - extended or after-hours use of the loading dock <br />29. In addition to cleaning requirements described above, Contractor shall, in preparation for substantial completion or occupancy of the <br />project by Tenant, perform final cleaning of Contractor's Work, <br />30, When Contractor- takes over an area from the Owner, before commencing work Contractor shall ascertain that the area is in a safe and <br />sanitary condition,and maintain the area as necossary (at its sole cost and expense) in it safe and sanitary condition and to a standard <br />meeting all applicable laws and regulations.. <br />31. Owner. requires lob progress meetings. The Contractor will attend with a representative uutluriicd to speak and act on the Contractor's <br />behalf. Additionally, ilia Contractor shall notify ilia Owner ofscheduledjob progress meetings. <br />1101 IV Chic CewerDr—C9rgafSauta.4aa f ease > Exhibit D <br />r <br />
The URL can be used to link to this page
Your browser does not support the video tag.