15. Doors to all work areas, Including stairwells and mechanical and electrical closets, will remain closed at all time. Propping doors open is
<br />expressly prohibited.
<br />16. All Contractor and subcontractor personnel, materials, tools and equipment are to enter and exit the Building through the service elevator
<br />only, Owner may at any time initiate a check in/check out system, or a badge system, for all people and material in the Building and the
<br />Contractor will agree to cooperate with any such system.
<br />17. Before ordering material or doing work which is dependent upon proper size or installation, the Contractor shall field verify all dimensions
<br />for accessibility with building conditions, and shall be responsible for saute.
<br />18. Contractor shall not permitted Bay identifying signage or advertising within the Project or Building.
<br />19. During construction, Contractor shall maintain supervisory personnel on the site at all times. Such personnel shall be fully authorized to
<br />coordinate, respond for and authorize Contractor's work as necessary so as to enable all work to proceed in a timely and well -ordered
<br />fashion. Should Contractor perform work which would cause or require Owner to provide personnel to be present or otherwise perform
<br />any work, Contractor shall reimburse Owner for the expense of such personnel.
<br />20• Contractor shall be responsible for the protection of its work and the area adjacent to his work.
<br />21. Contractor will ensure that all stairwells, mechanical rooms, electrical and telephone closets, etc, accessed by Contractor or subcontractors
<br />in conjunction with Contractor's work, will be cleaned and tree of debris nightly.
<br />22. Public areas adjacent to premises where Contractor's work is being performed shall remain free of debris and materials at all times.
<br />23, Contractor shall be responsible for all his actions on site as well as those of its subcontractors, and shall indemnify, defend and hold
<br />harmless the Owner mid the other Owner Patties from and against any and all claims, losses, or damages, threatened or incurred, arising
<br />from the actions or omissions of Contractor or its subcontractors.
<br />24• If keys are required by contractors, they must be checked out from the Property Management Office. No key will be distributed If proper
<br />identification is not provided.
<br />25. No cutting or patching of Owner's premises or installations, or those of any Building occupant, shall be permitted without the prior written
<br />consent of Owner. Request for permission to do cutting shall include explicit details and description of work and shall not under any
<br />circumstances diminish the structural integrity of tie Building or die Integrity of any of components m• systems. The work is to be done
<br />only with the explicit written permission of the Property Manager, and only on sit "Off -Hours" basis, Such work is to be done only under
<br />the direct supervision of a competent member of the Contractor staff, Any such area is to be promptly repaired and returned to a fully
<br />functioning, complete, and clean condition.
<br />26. All work is to be done to a minimum standard of quality as required by the Base Building Drawings and Specifications (to be made
<br />available by Owner upon request). It is the responsibility of the Contractor to be filly knowledgeable of the Base Building Drawings and
<br />Specifications.
<br />27, All Life Safety Systems for the Building are to be maintained, and all of the Tenant's work is to be properly interfaced with and connected
<br />to the Base Building systems as required by Laws, or by Building operation. All work is to be done in such a way as to protect all Base
<br />Building operations and warranties. Any required disconnection of life safety devices should be "foreseer" and tine Property Management
<br />Office must be notified at least 24 hoes in advance. Costs for false fire alarms due to contractors' or subcontractors' negligence will be
<br />billed to and paid by the Conunctor. All life -safety systems testing must he performed on an "after-hours" basis and coordinated with the
<br />Building Manager.
<br />28, When work is performed by Contractor or subcontractor, charges will apply for additional services performed by Owner which may
<br />include, but are not necessarily limited to tie following:
<br />A - overtime or after-liours elevator usage
<br />nlllity usage fbr construction activities beyond standard power and water used in connection with general office uses
<br />extra and continuous dean -up of elevators and public spaces as required due to construction activity; Contractor to provide tie
<br />usual protection of existing improvements, and exercise care and good sense
<br />extended or after-hours use of the loading dock
<br />29. In addition to cleaning roquiremenls described above, Contractor shall, in preparation for substantial completion or occupancy of the
<br />project by Tenant, pert'omh final cleaning orcoulructo's Work.
<br />30, When Contractor takes over an area front the Owner, before commencing work Contractor shall ascertain that the area is in a sale and
<br />sanitary condition, and maintain the area as necessary (at its sole cost and expense) in It sale and sanitary condition and to a standard
<br />alerting all applicable laws and regulations.
<br />31 • Owner requires Job progress meetings, -file Contractor will attend with a representative authorized to speak and act oil the Contractor's
<br />behalf. Additionally. the Contractor shall notify the Owner orscheduled job progress meetings.
<br />,YlI/ FVCirtie Center Or—CFry nJ'Smrrn.4an Lrna'r -5- Exhibit D