2. Within a reasonable time prior to the start of any on -site work, delivery of materials, equipment, or personnel, Contractor will submit to
<br />Owner the following:
<br />A- A complete set of drawings approved by Owner and subsequently by the City in which the Building is located.
<br />B- A filly executed Indemnity Agreement (To Be Provided by Owner Upon Request).
<br />C- Certificate of Insurance in a form approved by Owner executed by Insurance companies acceptable to Owner.
<br />D- A fully executed Notification -Rules for Contractors (To Be Provided by Owner Upon Request).
<br />F• A job schedule of the work to be accomplished, detailed by trade,
<br />F- A complete list of all proposed Subcontractors and suppliers. Owner must approve all contractors and subcontractors before
<br />commencement of their work.
<br />G- The name and phone number (including emergency phone numbers) of personnel who are authorized to represent the Contractor.
<br />3. No revisions or changes of any kind may be made to the construction plans previously approved by Owner without prior written consent of
<br />the Owner. Any proposed revisions or changes must be submitted to Owner in die form of a change order, for Owner's review and
<br />approval prior to commencement of such changes. Revisions or changes altering file floor plan, base building systems, or building
<br />operations must be submitted, in writing, to the Owner for review and approval prior to commencement of work.
<br />4. All of Contractor's work must be scheduled so (list it in no way conflicts with, interferes with, or impedes the quiet and penceral enjoyment
<br />of other tenants or occupants of the Project, or with the progress of Owner's work or operations. Any work that is in convict will be
<br />rescheduled by the Contractor to such time as approved by Owner. Additionally, Owner shall have no liability far any costs or expenses
<br />Incurred by Contractor (or Tenant) in connection with such rescheduling,
<br />5. Contractor and subcontractors shall employ persons and means for the orderly progress of the work without interruption on account of
<br />strikes, work stoppages or similar causes of delay, Additionally, Owner shall have no liability for any costs or expenses incurred by
<br />Contractor (or Tenant) in connection with such delays.
<br />6. Materials and tool storage will be limited to die arens for which access has been granted.
<br />7. Clean-up and rubbish removal shall be provided by the Conti actor at Contractor's expense. Contractor must, on a daily basis, remove all
<br />rubbish, surplus and waste material resulting from die performance of his work At the request of Owner, Contractor shall relocate airy
<br />materials causing an obstruction as directed by Owner. Contractor will not be allowed to place a dnmpster on site on a continuous basis
<br />during construction,
<br />Important note: The placement and location ofrubbish dumpsters and bins must be approved in advance by Owner.
<br />g. In general, Owner will interface with Contractor to the extent necessary for work to be completed within the guidelines of project
<br />specifications and for the enforcement ofbuilding rules and regulations.
<br />9, Contractor will make arrangements for unloading, trash removal and hoisting after normal working hours clue to die local city noise
<br />ordinance. (No such activity will be allowed between the hours of 10:00 p.m. to 7:00 a.m.) At no time will the Conuvctor be given
<br />exclusive reserved use of the freight elevator unless applied for by Contractor and approved by Owner. Contractor may be afforded access
<br />to loading clock space and hoisting facilities for limited use at such time during normal working hours as is prearranged with Owner, or at
<br />other times, with the consent of'Owner told upon payment of Owner's prevailing fee fur after-hours use slid access.
<br />I (1. Contractor will be afforded unloading areas as prearranged with Owner, All materials unloaded at these areas will be moved to an area of
<br />use immediately and shall not be stored or used in a way which adversely impacts use of the Building,
<br />11. Contractor (and Tenant) will be responsible for the security of its own materials, equipment and work, and that of his subcontractors.
<br />Contractor will also be responsible for damage caused by Contractor or its subcontractors to cite Project, Building and/or tenant areas,
<br />including. but not limited to the loading dock and indoor and outdoor public peas, freight elevators, etc. Any such damages will he
<br />promptly repaired to the Owners satisfaction at sole cost of Contractor.
<br />12, Contractor will comply with all applicable codes, laws and regulations pertaining to the work of Contractor, including all safely Laid health
<br />regulations, 'Fite Contractor shall supply the Owner with a Master List of all hazardous Materials and their Matcriul Safety Dam Sheers
<br />(bISUS) upon delivery to lhe,job site. A discussion will then ensuc pertaining to the safe storage, handling and use of these materials. as
<br />well as the Contractors emergency preparedness plan (or handling the containment and clean-up of potential Iiazordoos Material spills.
<br />l3 Contactor wil l not cngagc in any labor practice that ]Italy delay or otherwise inysnet the work ofOwner or any otherconn actor.
<br />14, No base building systems will be turned olf or disengaged by C'ununctur or tnv subcontractor without prior written approval and
<br />supervision by a representative ofOwner or its agent. Said systems include but are not limited to sprinklers. electrical circuits, air-hsml ling
<br />units. smoke head, and water supply. Building electrical power shut -downs are allowed, with the prior written consent ol`Ottmer. on
<br />Sauminys between 10:00 p.m. and 5:00 a.m. only. A request for approval shall be made to the Properly Manager at Icast ten ( Ill) drys in
<br />advmroc.