2. Within a reasonable time prior to the start of any on -site work, delivery of materials, equipment, or personnel, Contractor will submit to <br />Owner the following: <br />A- A complete set of drawings approved by Owner and subsequently by the City in which the Building is located. <br />B- A filly executed Indemnity Agreement (To Be Provided by Owner Upon Request). <br />C- Certificate of Insurance in a form approved by Owner executed by Insurance companies acceptable to Owner. <br />D- A fully executed Notification -Rules for Contractors (To Be Provided by Owner Upon Request). <br />F• A job schedule of the work to be accomplished, detailed by trade, <br />F- A complete list of all proposed Subcontractors and suppliers. Owner must approve all contractors and subcontractors before <br />commencement of their work. <br />G- The name and phone number (including emergency phone numbers) of personnel who are authorized to represent the Contractor. <br />3. No revisions or changes of any kind may be made to the construction plans previously approved by Owner without prior written consent of <br />the Owner. Any proposed revisions or changes must be submitted to Owner in die form of a change order, for Owner's review and <br />approval prior to commencement of such changes. Revisions or changes altering file floor plan, base building systems, or building <br />operations must be submitted, in writing, to the Owner for review and approval prior to commencement of work. <br />4. All of Contractor's work must be scheduled so (list it in no way conflicts with, interferes with, or impedes the quiet and penceral enjoyment <br />of other tenants or occupants of the Project, or with the progress of Owner's work or operations. Any work that is in convict will be <br />rescheduled by the Contractor to such time as approved by Owner. Additionally, Owner shall have no liability far any costs or expenses <br />Incurred by Contractor (or Tenant) in connection with such rescheduling, <br />5. Contractor and subcontractors shall employ persons and means for the orderly progress of the work without interruption on account of <br />strikes, work stoppages or similar causes of delay, Additionally, Owner shall have no liability for any costs or expenses incurred by <br />Contractor (or Tenant) in connection with such delays. <br />6. Materials and tool storage will be limited to die arens for which access has been granted. <br />7. Clean-up and rubbish removal shall be provided by the Conti actor at Contractor's expense. Contractor must, on a daily basis, remove all <br />rubbish, surplus and waste material resulting from die performance of his work At the request of Owner, Contractor shall relocate airy <br />materials causing an obstruction as directed by Owner. Contractor will not be allowed to place a dnmpster on site on a continuous basis <br />during construction, <br />Important note: The placement and location ofrubbish dumpsters and bins must be approved in advance by Owner. <br />g. In general, Owner will interface with Contractor to the extent necessary for work to be completed within the guidelines of project <br />specifications and for the enforcement ofbuilding rules and regulations. <br />9, Contractor will make arrangements for unloading, trash removal and hoisting after normal working hours clue to die local city noise <br />ordinance. (No such activity will be allowed between the hours of 10:00 p.m. to 7:00 a.m.) At no time will the Conuvctor be given <br />exclusive reserved use of the freight elevator unless applied for by Contractor and approved by Owner. Contractor may be afforded access <br />to loading clock space and hoisting facilities for limited use at such time during normal working hours as is prearranged with Owner, or at <br />other times, with the consent of'Owner told upon payment of Owner's prevailing fee fur after-hours use slid access. <br />I (1. Contractor will be afforded unloading areas as prearranged with Owner, All materials unloaded at these areas will be moved to an area of <br />use immediately and shall not be stored or used in a way which adversely impacts use of the Building, <br />11. Contractor (and Tenant) will be responsible for the security of its own materials, equipment and work, and that of his subcontractors. <br />Contractor will also be responsible for damage caused by Contractor or its subcontractors to cite Project, Building and/or tenant areas, <br />including. but not limited to the loading dock and indoor and outdoor public peas, freight elevators, etc. Any such damages will he <br />promptly repaired to the Owners satisfaction at sole cost of Contractor. <br />12, Contractor will comply with all applicable codes, laws and regulations pertaining to the work of Contractor, including all safely Laid health <br />regulations, 'Fite Contractor shall supply the Owner with a Master List of all hazardous Materials and their Matcriul Safety Dam Sheers <br />(bISUS) upon delivery to lhe,job site. A discussion will then ensuc pertaining to the safe storage, handling and use of these materials. as <br />well as the Contractors emergency preparedness plan (or handling the containment and clean-up of potential Iiazordoos Material spills. <br />l3 Contactor wil l not cngagc in any labor practice that ]Italy delay or otherwise inysnet the work ofOwner or any otherconn actor. <br />14, No base building systems will be turned olf or disengaged by C'ununctur or tnv subcontractor without prior written approval and <br />supervision by a representative ofOwner or its agent. Said systems include but are not limited to sprinklers. electrical circuits, air-hsml ling <br />units. smoke head, and water supply. Building electrical power shut -downs are allowed, with the prior written consent ol`Ottmer. on <br />Sauminys between 10:00 p.m. and 5:00 a.m. only. A request for approval shall be made to the Properly Manager at Icast ten ( Ill) drys in <br />advmroc. <br />901 Pb`Ch 7rr Cenrnr Dr—City•nJ'Senet:Inn!.ease -4- FX[A It 0 <br />