15. Doors to all work areas, including stairwells and mechanical and electrical closets, will remain closed at all time. Propping doors open is
<br />expressly prohibited,
<br />16. All Contractor and subcontractor personnel, materials, tools and equipment me to enter and exit the Building through the service elevator
<br />only. Owner may at any time initiate a check in/check out system, or a badge system, for all people and material in the Building and the
<br />Contractor will agree to cooperate with any such system.
<br />17. Before ordering material or doing work which is dependent upon proper size or installation, the Contractor shall field verify all dimensions
<br />for accessibility with building conditions, and shall be responsible for some,
<br />18. Contractor shall not permitted any identifying signage or advertising within the Project or Building,
<br />19. During construction, Contractor shall maintain supervisory personnel on the site at all times. Such personnel shall be fully authorized to
<br />coordinate, respond for and authorize Contractor's work as necessary so as to enable ail work to proceed in a timely and well -ordered
<br />fashion. Should Contractor perform work which would cause or require Owner to provide personnel to be present or otherwise perforin
<br />any work, Contractor shall reimburse Owner for the expense of such personnel.
<br />20. Contractor shall be responsible for the protection of its work and the area adjacent to his work.
<br />21 • Contractor will ensure that all stairwells, mechanical rooms, electrical and telephone closets, etc, accessed by Contractor or subcontractors
<br />in conjunction with Contractor's work, will be cleaned and fiee ofdebds nightly.
<br />22, public areas adjacent to premises where Contractor's work is being performed shall remain free of debris and materials at all times.
<br />23. Contractor shall be responsible for all his actions on site as well as those of its subcontractors, and shall indemnify, defend and hold
<br />harmless the Owner and the other Owner Parties from and against any and all claims, losses, or damages, threatened or incurred, arising
<br />from the actions or omissions of Contractor or Its subcontractors.
<br />24,. If keys are required by contractors, they must be checked out from the Property Management Office. No key will be distributed If proper
<br />identification is not provided.
<br />25. No cutting or patching of Owner's premises or installations, or those of any Building occupant, shall be permitted without the prior written
<br />consent of Owner. Request for permission to do cutting shall include explicit details and description of work and shall not under any
<br />circumstances diminish the structural integrity of the Building or the integrity of any of components ur systems, The work is to be done _
<br />only with the explicit written permission of due Property Manager, and only on an "Off -flours" basis, Such work is to be done only under
<br />due direct supervision of a competent member of the Contractor staff. Any such area is to Inc promptly repaired and returned to a fully
<br />functioning, complete, and clean condition.
<br />26. All work is to be done to a minimum standard of quality as required by the Base Building Drawings and Specifications (to be made
<br />available by Owner upon request)- It is the responsibility of the Contractor to be filly knowledgeable of the Base Building Drawings and
<br />Specifications.
<br />27, All Life Safety Systems for the Building are to be maintained, and all of the Tenant's work is to be properly interfaced with and connected
<br />to the Base Building systems as required by Laws, or by Building operation. All work is to be done in such a way as to protect all Base
<br />Building operations and warranties. Any required disconnection of life: safety devices should be "Foreseen" and the Property Management
<br />Office must be notified at least 24 hours in advance. Costs for false fire alarms due to contractors' or subcontractor' negligence will be
<br />billed to and paid by the Contractor. All life -safety systems testing must he performed on an "after-hours" basis and coordinated with due
<br />Building Manager.
<br />28. When work is performed by Contractor or subcontractor, charges will apply for additional services performed by Owner which may
<br />include, but are not necessarily limited to the following:
<br />A - overtime or after-hours elevator usage
<br />B • utility usage for construction activities beyond standard power and water use(] in connection with general office uses
<br />C , extra and continuous clean-up of elevalurs and public spaces as required due to consuuction activity; Contractor to provide the
<br />usual protection of existing improvements, and exercise care and good sense
<br />D - extended or aller-hours use of the loading dock
<br />29. In addition to clearing roquivements described above, Contractor shall, in preparation far substantial completion or occupancy or the
<br />pi ojcct by Tenant, perform final cleaning of Crnt(aetor5 Will
<br />30, When Contactor lakes over an area from the Owner, before conunencing work Contractor shall ascertain Ihnt the area is in a safe and
<br />sanitary condition, and maintain the area as necessary (at its sole cost and expense) in a sale and sanitary condition and to a standard
<br />meeting all applicable laws and regulations.
<br />31. Owner requires job progress meetings. T'he Contractor will attend with a representative authorized hn speak and act on the Contractor's
<br />behalf. AddiNonolly, the Conraetor shall notify the Owner of scheduledjob progress meetings.
<br />891 WCivie Center Dr-0tv eil'santu bur Leave -5- FxllbitD