Laserfiche WebLink
32. All work or on -site activity during non -normal working hours will be coordinated in advance with Owner, <br />33. At no time will Contractor perform activities on the Project without the proper insurance in force. <br />34. No radios Oro Lher audio dcv Ices eve allowed. <br />35. Failure to perfarn work In a manner consistent with the above stated Rules of the Site may result in immediate work stoppage by Owner. <br />Owner shall have no liability for any costs or expenses incurred by Connector or any subcontractors (or Tenant) iu connection with or as a <br />result of such wm•k stoppage. <br />36. The Rules orthe Site may be amended or revised at any time to fit the situation at the time. The amended or revised Rules of the Site shall <br />become efrective upon delivery to Contractor or publication by posting at dre project site, whichever is earlier. <br />37. General contractor and subcontractors' vehicles parking mutt be in areas designated by the Building Manager at the Contractor's expense. <br />Acknowledged and Agreed <br />By; <br />Date; <br />8011VCA9cC'eulerDr--CiO ofSmrmdrm Lease -6- Gxhibir D <br />