My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75D - PH- MAIN PLACE TRANSFORMATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
06/04/2019
>
75D - PH- MAIN PLACE TRANSFORMATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 7:32:33 PM
Creation date
5/30/2019 5:10:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75D
Date
6/4/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
702
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
and contractor (requiring General Engineering "A" or a "C-34" license) will do design <br />and installation. <br />All residential units require individual meters, master meter for the building with <br />individual private meters for each unit. <br />Provide fire flow calculations for fire line and bacicflow device suggested sizing. <br />Contact OCFA Plan Check, at (714) 573-6126, for assistance. <br />5. Prior to turning on any water meters (domestic and irrigation) and/or fire services, arrange <br />for installation, testing and certification of all needed BACKFLOW PROTECTION <br />DEVICES, whether such devices are shown on the project plans or not. The developer <br />in conformance with the code, regulations and the City of Santa Ana requirements will <br />install approved bacicflow devices on -site. <br />(Please obtain latest list of approved backflow prevention assemblies from USC <br />foundation for Cross Connection Control and Hydraulic Research.) <br />General requirements (Sewer): <br />All new development projects fronting OCSD sewer shall construct a new City owned <br />sewer main and be served by a separate and new sewer lateral connection(s) to serve each <br />individual lot or parcel. Use of a common or shared sewer lateral/system among separate <br />commercial/industrial parcels or residential lots (with no direct public sewer access) is <br />only allowed if a CC&R for maintenance and cost sharing responsibility of such <br />laterals/systems is prepared and recorded. (Added to comment by Rudy Rosas) <br />2. A complete Sewer Feasibility Study (SFS) required for this project. It is required to <br />complete SITS prior to any permit issuance. <br />3. The Developer shall arrange for the design and construction of a new sewer mains as well <br />as sewer lateral(s) per City of Santa Ana Standards and approved Improvement Plans, <br />following the issuance of a Street Work Permit. The developer's engineer (License Civil <br />Engineer) and contractor (requiring General Engineering "A" or a "C-34" license) will do <br />design and installation. <br />4. Use of a common or shared sewer lateral/system among separate commercial/industrial <br />parcels or residential lots (with no direct public sewer access) only allowed if a CC&R for <br />maintenance and cost sharing responsibility of such laterals/systems prepared and <br />recorded. <br />75D-113 <br />
The URL can be used to link to this page
Your browser does not support the video tag.