Laserfiche WebLink
Sewer <br />Project Impacts <br />The project is estimated to generate approximately 490,000 <br />gallons of sewage per day. The existing sewage system does not have the <br />capacity to serve the project and therefore, additional sewer facilities <br />would be required. The size and location of the required sewer <br />facilities would be determined when final site plans become available. <br />Mitigation Measures <br />No mitigation measures are proposed. <br />Solid Waste <br />.. j <br />Project Impacts <br />The proposed project would result in a net generation of <br />approximately 33 tons of solid waste per day. Since the County <br />anticipates having adequate landfill capacity to last beyond the year . <br />2000, no significant adverse impacts are anticipated. However, the <br />?;. project would have an incremental impact on the reduction of the life <br />capacity of the Coyote Canyon landfill site. <br />1 <br />.v <br />Mitigation Measures <br />r <br />i <br />t: <br />No mitigation measures are proposed. <br />1 <br />i Police <br />i Project Impacts <br />The types of crimes that can reasonably be expected to <br />increase due to the project would be larceny, crimes against persons, <br />f <br />75D)58 <br />