Laserfiche WebLink
I <br />R <br />1 <br />facilities located in the area and the electric loads of the project are <br />within parameters of projected load growth which Edison is planning to <br />iR <br />meet in this area. <br />IR Mitigation Measures <br />No mitigation measures are proposed other than the energy <br />conservation measures discussed in Section 5.14 (Energy) of this report. <br />1 <br />Telephone <br />r E <br />�u Project Impacts <br />f <br />Although the project would be served from existing facilities, <br />reinforcement of the existing telephone network would be necessary. The <br />e degree of reinforcement would vary from new tables being pulled through <br />existing conduit systems to the installation of new conduit and cable <br />systems. <br />1' f, <br />Mitigation Measures <br />i No mitigation measures are proposed. <br />i..,_ Water <br />I <br />Project Impacts <br />1� <br />The proposed project is estimated to consume approximately <br />490,000 gallons of water per day. The project would be served by <br />existing water mains in the area, however, some improvements to the <br />system may be required at the time of development in accordance with the <br />i, City's standard building permit approval process. <br />r <br />Mitigation Measures <br />No mitigation measures are proposed. <br />+r <br />i 75D-1 9! <br />