My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75D - PH- MAIN PLACE TRANSFORMATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
06/04/2019
>
75D - PH- MAIN PLACE TRANSFORMATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 7:32:33 PM
Creation date
5/30/2019 5:10:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75D
Date
6/4/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
702
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />R <br />1 <br />facilities located in the area and the electric loads of the project are <br />within parameters of projected load growth which Edison is planning to <br />iR <br />meet in this area. <br />IR Mitigation Measures <br />No mitigation measures are proposed other than the energy <br />conservation measures discussed in Section 5.14 (Energy) of this report. <br />1 <br />Telephone <br />r E <br />�u Project Impacts <br />f <br />Although the project would be served from existing facilities, <br />reinforcement of the existing telephone network would be necessary. The <br />e degree of reinforcement would vary from new tables being pulled through <br />existing conduit systems to the installation of new conduit and cable <br />systems. <br />1' f, <br />Mitigation Measures <br />i No mitigation measures are proposed. <br />i..,_ Water <br />I <br />Project Impacts <br />1� <br />The proposed project is estimated to consume approximately <br />490,000 gallons of water per day. The project would be served by <br />existing water mains in the area, however, some improvements to the <br />system may be required at the time of development in accordance with the <br />i, City's standard building permit approval process. <br />r <br />Mitigation Measures <br />No mitigation measures are proposed. <br />+r <br />i 75D-1 9! <br />
The URL can be used to link to this page
Your browser does not support the video tag.