My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75D - PH- MAIN PLACE TRANSFORMATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
06/04/2019
>
75D - PH- MAIN PLACE TRANSFORMATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 7:32:33 PM
Creation date
5/30/2019 5:10:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75D
Date
6/4/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
702
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I <br />5.13 Public Services and Utilities <br />5.13.1 Natural Gas <br />5.13.1.1 Environmental Setting <br />Natural gas is currently provided to the existing uses on the <br />project site by the Southern California Gas Company. Gas service could <br />be provided to —the proposed project by existing gas mains on the site. <br />Natural gas service would be provided in accordance with the Company's <br />policies and extension rules on file with the California Public <br />Utilities Commission.* <br />5.13.1.2 Impacts <br />Project Impact <br />The existing uses on the project site consume approximately <br />13,702,560 cubic feet of natural gas per month. Mainstreet Center and <br />Fashion Square consume approximately 3,268,060 and 10,434,500 cubic feet <br />of natural gas per month respectively.** As indicated in Table 42, the <br />proposed project would consume approximately 86,210,000 cubic feet of <br />natural gas per month. <br />The removal of Mainstreet Center and the construction of the <br />proposed project would result in a net increase in consumption of <br />natural gas of approximately 72,507,440 cubic feet per month. The <br />Southern California Gas Company has indicated that the proposed project <br />would not have a significant impact on its ability to provide natural <br />gas service to the project*** (Refer to Appendix IV). <br />* J. D. Allen, Southern California Gas Company. <br />i <br />** Based on 20 cubic feet a month per square foot. <br />75D-31 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.