My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75D - PH- MAIN PLACE TRANSFORMATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
06/04/2019
>
75D - PH- MAIN PLACE TRANSFORMATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 7:32:33 PM
Creation date
5/30/2019 5:10:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75D
Date
6/4/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
702
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br />5,13.3.4 Significant Environmental Effects <br />No substantial adverse impacts are anticipated. <br />5.13.4 Water <br />1 <br />4 <br />5.13.4.1 Environmental Setting_ <br />u <br />The City of Santa Ana currently provides water service to the <br />I€. <br />project site. Fashion Square is served by a 12 inch water main located <br />at the southern boundary of Fashion Square center and the Mainstreet <br />Center is served by an 8 inch water main located along its southern <br />L boundary. The City also has a 16 inch water main in Owens Drive at <br />Main Street that is proposed to extend west to the proposed Broadway <br />Street overcrossing. This 16 inch main could then be extended north to <br />the proposed project to support the existing water distribution <br />facilities.* <br />L <br />5.13.4.2 Impacts <br />L <br />Project Impacts <br />1. <br />u <br />i. The existing uses on the site consume approximately 68,513 <br />s gallons of water per day, assuming a consumption rate of 100 gallons/ <br />f: <br />1000 square feet/day. The proposed project is estimated to consume <br />1 approximately 490,000 gallons of water per day (See Table 46). <br />L: <br />The removal of Mainstreet Center and the construction of the <br />proposed project would result in a net increase in water consumption of <br />approximately 421,487 gallons per day.. <br />+ <br />* Walter Schraub, City of Santa Ana Public Works Department, telephone <br />i� <br />conversation May 8, 1981. <br />75D-326 <br />
The URL can be used to link to this page
Your browser does not support the video tag.