Laserfiche WebLink
The project can be served by the existing water mains in the <br />area. Some improvement to the system might be required, at the time <br />that precise development plans are submitted, in accordance with the <br />standard City building permit approved process. (Refer to Appendix IV). <br />a <br />The project would be required to meet all State mandated water <br />conservation measures, including use of low -flush toilets, turn-off <br />adapters and faucet flow control devices to reduce water consumption. <br />i. <br />Cumulative Impacts <br />As indicated in Table 47, cumulative projects in the vicinity <br />j; of the proposed project would consume approximately 624,969 gallons of <br />water per day. The net increase in consumption, considering cumulative <br />i projects and the proposed Fashion Square project would be approximately <br />1,046,456 gallons of water per day. <br />TABLE 46 <br />i_ <br />I <br />I <br />PROJECT WATER CONSUMPTION <br />Land Use Square Feet Consumption Rate* Consumption <br />Office 1,500,000 100 Gal/1O00Sq.Ft./Day 150,000 Gal/Day <br />Retail 1,600,000 100 Gal/1000Sq.Ft./Day 160,000 Cal/Day <br />Retail <br />979,200 150 Gal/Room 180,000 Gal/Dayl <br />1 <br />City yC of Los Angeles, FIR Manual for Private Projects, 1975, updated <br />1976. <br />75D1127 <br />