My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75D - PH- MAIN PLACE TRANSFORMATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
06/04/2019
>
75D - PH- MAIN PLACE TRANSFORMATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 7:32:33 PM
Creation date
5/30/2019 5:10:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75D
Date
6/4/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
702
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Southern California Edison Company <br />P 0 BOX 2307 <br />^ SANTA ANA CALIFORNIA 927107 <br />May, 1981 <br />RECr NED <br />DORIS STARNES MiAY 12 <br />Ultra Systems, Inc. <br />L 2400 Michelson Dr. iU�E•i U;V. <br />Irvine, CA 92715 <br />�1 <br />L <br />This is to advise that the subject property is located <br />within the service territory of the Southern California <br />Edison Company and that the electric loads of the project <br />are within parameters of projected load growth which Edison <br />C, <br />is planning to meet in this area. <br />Unless the demand for electrical generating capacity <br />F. <br />exceeds our estimates, and provided that there are no <br />unexpected outages to major sources of electrical supply, <br />we expect to meet our electrical load requirements for <br />�- <br />the next several years. <br />Our total system demand is expected to continue to increase <br />annually; and, if our plans to proceed with future cons- <br />truction of new generating facilities are delayed, our <br />ability to serve all customer loads during peak demand <br />periods could become marginal by 1984. <br />is <br />In addition, the major fuel used in Edison's generating <br />facilities is low sulfur fuel oil. Die now believe that <br />our low sulfur fuel oil inventory, together with our <br />contractual commitments for delivery and our customers' <br />conservation efforts will permit us to meet the current <br />forecasted demands for electricity through 1981. <br />It is our intention to continue to do everything that can <br />reasonably be acconplished to provide our customers with a <br />continuous and sufficient supply of electricity. <br />Enclosed is a single -line diagram of Southern <br />Edison Co. existing overhead facilities in the <br />proposed redevelopment project. <br />California <br />area of the <br />75D-376 <br />
The URL can be used to link to this page
Your browser does not support the video tag.