My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75D - PH- MAIN PLACE TRANSFORMATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
06/04/2019
>
75D - PH- MAIN PLACE TRANSFORMATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 7:32:33 PM
Creation date
5/30/2019 5:10:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75D
Date
6/4/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
702
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Both freeway crossings will remain overhead on existing <br />structures as shown to maintain Edison system integrity. <br />Within the proposed project, Edison maintains 4-12000V circuits <br />served from 4 adjacent substations. Three circuits enter the <br />area on overhead structures, one circuit enters the project <br />underground from the East. Edison maintains an extensive <br />underground system within the northerly portion (Fashion <br />Square Shopping Center) of the proposed site. <br />The development will be served by existing Edison facilities. <br />Please contact Edison Energy Services representative, Bob Miller, <br />714-835-3833 concerning conservation information for this <br />project. <br />If I can be of any further assistance on this project, <br />please contact me at 714-835-3833. <br />BKS/lp <br />Sincerely, <br />B. K. SMITH <br />Service Planner <br />75D-377 <br />
The URL can be used to link to this page
Your browser does not support the video tag.