My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75D - PH- MAIN PLACE TRANSFORMATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
06/04/2019
>
75D - PH- MAIN PLACE TRANSFORMATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2019 7:32:33 PM
Creation date
5/30/2019 5:10:30 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75D
Date
6/4/2019
Destruction Year
2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
702
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAYOR <br />MAYOR <br />4rn Cam), <br />VKI MAYt IR CIIYMANACLR <br />H. W lu.rudwniq..r A 1. Wd>un <br />( O11N(II MI MITI K CItYAIlORNIV <br />luhn A, (AU Edward I. C" per <br />Dame)1. Grnrt CLERK Of IHE COUNCIL <br />I- Ogden Markel Janice C. Guy <br />Allied A.e,,atog°° CITY OF SANTA ANA <br />Allred C. $erraw <br />May 18, 1981 20CIVIL '('INIIRPIAZA.P.O.BOX 19R8 RECEIVED <br />SANI A ANA. CALII ORNIA 927112 <br />1AAY 2 - i981 <br />CNVIRC.N.A _NTAL <br />Doris Starnes o:e. <br />Ultrasystem, Inc. <br />2400 Michelson Drive <br />P.O. Box 19605 <br />Irvine, CA 92715 <br />SUBJECT: FASHION SQUARE REDEVELOPMENT PROJECT <br />Dear Ms. Starnes: <br />A' <br />Your letter of April 24, 1981 to Walter Schraub indicated that you are in <br />the process of preparing an enviromental impact report for the above project. <br />You asked us to answer several questions pertaining to the existing sewer <br />and storm drain facilities. <br />One of the questions pertains to the sewage treatment plant and whether it: <br />has capacity to serve the proposed project. As you may have concluded, our <br />sewer systems are connected to Orange County Sanitation trunk lines, which <br />in turn carry the sewage to their treatment plant in Fountain Valley. The <br />_ administration office 'is located at 10844 Ellis Avenue. We do not envision <br />any capacity problem, but it is advised that you contact an O.C.S.D. rep- <br />resentative for your answer. <br />I <br />The Fashion Square area is served by an 8" sewer in Roe Drive and a 12" sewer <br />in Roe Drive and Main Street. There is sufficient capacity for your proposed <br />alternatives 1 or 2, but alternatives 3 or 4 would require the construction of <br />additional sewer facilities. <br />Drainage should not be a problem, since the area is essentially all paved now. <br />We have a 42" 0 storm drain in Main Street and a 36" b line in Arnett Drive, <br />both of which discharge into Santiago Creek. The northwest portion of Fashion <br />Square drains into an open channel which is part of the state freeway drainage <br />system emptying into the Santa Ana River. <br />If you wish to discuss the above information in greater detail, please call <br />Joseph Hopper at 834-4152. <br />eSincerely, •%� <br />Z"n"Bl� �"urk <br />/ Senior Civil Engineer -Design <br />Enclosure: Plan <br />JH/gg <br />75D-380 <br />
The URL can be used to link to this page
Your browser does not support the video tag.