Laserfiche WebLink
Table 4 <br />Project Trip Generation <br />PM Peak Hour <br />Daily <br />Rate <br />In <br />Out <br />Proposed Uses <br />Units <br />Rate <br />Retail <br />69,000 sq. ft. <br />73.56 <br />3.09 <br />3.09 <br />Restaurant <br />8,000 sq, ft. <br />200.89 <br />10.56 <br />9.37 <br />Cinema <br />70,000 sq, ft. <br />77.79 <br />6.77 <br />0.37 <br />Drive-Thru ATM <br />4 stations <br />26.29 <br />28.48 <br />Source: Institute of Transportation Engineering, Trip Generation, 5th Ed. <br />PM Peak Hour <br />Daily <br />Trips <br />in <br />Out <br />Proposed Uses <br />Units <br />Trips <br />Retail <br />69,000 sq. ft. <br />5,076 <br />214 <br />214 <br />Restaurant <br />8,000 sq. ft. <br />1,607 <br />84 <br />75 <br />Cinema <br />70,000 sq. ft. <br />5,446 <br />404 <br />26 <br />Drive-Thru ATM <br />4 stations <br />105 <br />114 <br />TOTAL <br />12,1281 <br />8071 <br />428 <br />Source: Korve Engineering, Inc„ March, 1996. <br />Addendum &Rfor a/n Place/Santa Ana (ER96433) � April 4. 19 6 <br />Page 13 Project No. 96466 <br />75D-403 <br />