My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-040 - Mainplace Mall Transformation
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2019
>
2019-040 - Mainplace Mall Transformation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2019 10:01:52 AM
Creation date
6/20/2019 8:39:53 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2019-040
Date
6/4/2019
Destruction Year
P
Document Relationships
2019-041 - Approving Tentative Parcel Map No. 2018-01
(Amended By)
Path:
\Resolutions\CITY COUNCIL\2011 -\2019
NS-2967 - Approving Development Agreement No. 2018-02 Between City of Santa Ana and Mainplace ShoppingTown, LLC for Mainplace Mall Transformation Project
(Amended By)
Path:
\Ordinances\2011 - 2020 (NS-2813 - NS-3000)\2019 (NS-2963 - NS-2978
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2935
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana Addendum to the <br />MainPlace Mall Transformation Proiect Fashion Square Commercial Center Final EIR <br />5.11 HOUSING AND POPULATION <br />Summary of Impacts Identified in the 1983 EIR <br />The 1983 EIR described buildout of the Originally Approved Plan as having the potential <br />to generate 8,630 employees, which was 29 percent of the average annual job growth <br />for Orange County and would have an impact on housing demands. Most of the <br />positions were anticipated to be filled by persons already residing in Santa Ana or the <br />surrounding area and would provide residents the opportunity to work in Santa Ana. <br />However, the 1983 EIR determined that the Originally Approved Plan would result in an <br />increase in the demand for housing that would add to housing market problems, such <br />as difficulties finding affordable housing and increasing housing costs. <br />Summary of Impacts Identified in the 1996 Addendum <br />The 1996 Addendum described that based on the projected employment figures that <br />were generated in the 1983 EIR, for a commercial/retail establishment, 1 employee is <br />required for every 500 square feet of space. For the expansion of approximately <br />147,000 square feet, approximately 300 new employees may be required. The 1996 <br />Addendum stated that most employees would be hired from the local surrounding <br />community, with the exception of higher -level managerial personnel who may commute. <br />The 1996 Addendum determined that the number of new employees resulting from the <br />expansion would not have an effect on the demand for new housing in the area and <br />would not create a significant inflow of persons relocating to the area. In addition, the <br />addendum determined that no significant impacts would result to population or housing <br />demands within Santa Ana or the surrounding communities. <br />Impacts Associated with the Proposed Project <br />No New Impact. The proposed Project would modify the planned land uses by reducing <br />the total commercial, office, and hotel uses and adding residential uses, when <br />compared against the Originally Approved Plan. The Project site is currently developed <br />with 1,130,000 square feet of commercial uses. The proposed Project would modify the <br />approved buildout of the site by reducing the total allowable commercial and office <br />space by 859,255 square feet and allowing the development of up to 1,900 residential <br />units. Overall, these Proposed Modifications would provide a more balanced buildout of <br />onsite land uses. <br />It is anticipated that at buildout of the proposed Project, 3,425 full time jobs (Kosmont <br />2018) would be provided onsite, along with 1,900 residential units, resulting in an onsite <br />ratio of 1.8 jobs per household at full occupancy of the site. Because the proposed <br />Project includes housing units, the Project would not result in an increase in demand for <br />housing. In addition, the Projects would be required to comply with the City's Housing <br />Opportunity Ordinance (HOO) prior to issuance of a building permit. Affordable housing <br />provisions under the HOO consists of either provision of affordable units on -site, off -site, <br />or payment of an in -lieu fee. <br />139 <br />
The URL can be used to link to this page
Your browser does not support the video tag.