My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-040 - Mainplace Mall Transformation
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2019
>
2019-040 - Mainplace Mall Transformation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2019 10:01:52 AM
Creation date
6/20/2019 8:39:53 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2019-040
Date
6/4/2019
Destruction Year
P
Document Relationships
2019-041 - Approving Tentative Parcel Map No. 2018-01
(Amended By)
Path:
\Resolutions\CITY COUNCIL\2011 -\2019
NS-2967 - Approving Development Agreement No. 2018-02 Between City of Santa Ana and Mainplace ShoppingTown, LLC for Mainplace Mall Transformation Project
(Amended By)
Path:
\Ordinances\2011 - 2020 (NS-2813 - NS-3000)\2019 (NS-2963 - NS-2978
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2935
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mitigation Program for the <br />City of Santa Ana MainPlace Mall Transformation Project <br />Final EIR Mitigation Measures (MMs) <br />Applicable? <br />Explanation <br />MM 5.6-5: A. Provide for redesign and reconstruction of the Main Street <br />Not <br />Final EIR Mitigation Measure 5.6-5 was previously implemented. No <br />Entrance to Fashion Square to accommodate two entry and exit lanes <br />applicable. <br />additional mitigation is required. <br />and a left turn pocket. The entrance shall be integrated with the new <br />public roadway planned around the site to link with Bedford Road, the <br />freeway ramps and Broadway/Owens Drive. The signalized entrance <br />shall be modified to include separate left turn phasing. <br />B. Provide sufficient funding for the reconstruction of the median island <br />on Town and Country Road to include a separate westbound left turn <br />lane. The existing median is a wide landscaped island with no separate <br />turning lane. <br />Fashion Square will be the primary beneficiary of this reconstruction even <br />though the new westbound left turn lane is not intended to directly serve <br />Fashion Square traffic. Widening of the Main Street Entrance will mitigate <br />the effect of increased traffic (primarily east -west direction) created by <br />expansion of the shopping center. <br />MM 5.6-6: Provide for installation of two new traffic signals on La Veta <br />Not <br />Final EIR Mitigation Measure 5.6-6 was previously implemented. No <br />Avenue at Bedford Road and the off -ramp from the southbound Rte. 57 <br />applicable. <br />additional mitigation is required. <br />Freeway. <br />In order to facilitate access to Fashion Square from the Rte. 57 Freeway <br />a traffic signal will be needed on Bristol Street/La Veta at the off -ramp <br />location. Presently, this intersection is controlled only by stop signs and a <br />left turn from the off -ramp to La Veta Avenue involves considerable delay. <br />This off -ramp provides a convenient route to Fashion Square and allows <br />southbound freeway traffic to avoid congestion encountered at the I- <br />5/57/22 Interchange. To promote use of this alternative access, especially <br />by commuters, signalization of two intersections is necessary. One <br />location, Bristol/La Veta at the Freeway off -ramp is under the jurisdiction <br />of the State and the other intersection, La Veta/Bedford is the <br />responsibility of the City of Orange. <br />MM 5.6-7: Develop and maintain an aggressive Transportation Systems <br />Ongoing and <br />Management (TSM) Program designed to maximize use of transit and <br />applicable. <br />
The URL can be used to link to this page
Your browser does not support the video tag.