Laserfiche WebLink
City of Santa Ana Addendum to the <br />MainPlace Mall Transformation Project Fashion Square Commercial Center Final EIR <br />alternatives that were not known and could not have been known when the 1983 EIR <br />was adopted as completed. <br />Mitigation Measures <br />No mitigation measures related to hydrology were included in the 1983 EIR and none <br />are required for the proposed Project, as impacts would remain less than significant <br />through compliance with NPDES requirements and implementation of the Specific <br />Plan's design guidelines. <br />.o] <br />