My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-040 - Mainplace Mall Transformation
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2019
>
2019-040 - Mainplace Mall Transformation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2019 10:01:52 AM
Creation date
6/20/2019 8:39:53 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2019-040
Date
6/4/2019
Destruction Year
P
Document Relationships
2019-041 - Approving Tentative Parcel Map No. 2018-01
(Amended By)
Path:
\Resolutions\CITY COUNCIL\2011 -\2019
NS-2967 - Approving Development Agreement No. 2018-02 Between City of Santa Ana and Mainplace ShoppingTown, LLC for Mainplace Mall Transformation Project
(Amended By)
Path:
\Ordinances\2011 - 2020 (NS-2813 - NS-3000)\2019 (NS-2963 - NS-2978)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2935
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Main Place Mall Transformation Project <br />TABLE OF CONTENTS <br />traffic Impact Study <br />Section Page No. <br />1 INTRODUCTION...........................................................................................................................................................1 <br />1.1 Background......................................................................................................................................................1 <br />1.1.1 Fashion Square Commercial Center Final EIR -1983........................................................................1 <br />1.1.2 Addendum to the Final EIRfor MainPlace/ Santa Ana —2000.........................................................2 <br />2 PROPOSED PROJECT DESCRIPTION <br />2.1 Project Location...............................................................................................................................................3 <br />2.2 Proposed Project.............................................................................................................................................3 <br />3 ANALYSIS SCENARIOS AND METHODOLOGY.............................................................................................................11 <br />3.1 Analysis Scenarios.........................................................................................................................................11 <br />3.2 Study Area and Intersections........................................................................................................................11 <br />3.3 Intersection Analysis Methodology...............................................................................................................12 <br />3.3.1 Roadway Segment Analysis.............................................................................................................12 <br />3.4 Performance Criteria.....................................................................................................................................13 <br />3.5 Significance Thresholds.................................................................................................................................13 <br />4 EXISTING TRAFFIC ENVIRONMENT/AREACONDITIONS............................................................................................14 <br />4.1 Existing Transportation System.....................................................................................................................14 <br />4.2 Existing Transportation Improvements.........................................................................................................15 <br />4.3 Transit Service...............................................................................................................................................16 <br />5 EXISTING TRAFFIC CONDITIONS................................................................................................................................19 <br />5.1 Existing Traffic Volumes................................................................................................................................21 <br />5.2 Peak Hour Intersection Analysis....................................................................................................................21 <br />5.3 Daily Roadway Analysis.................................................................................................................................25 <br />6 PROPOSED PROJECT TRAFFIC...................................................................................................................................26 <br />6.1 Project Trip Generation.................................................................................................................................26 <br />6.2 Project Trip Distribution and Assignment.....................................................................................................29 <br />7 EXISTING PLUS PROPOSED PROJECT CONDITIONS...................................................................................................41 <br />7.1 Peak Hour Intersection Analysis....................................................................................................................41 <br />7.2 Daily Roadway Analysis.................................................................................................................................41 <br />8 EXISTING PLUS CURRENT PROJECT ENTITLEMENTS..................................................................................................49 <br />8.1 Peak Hour Intersection Analysis....................................................................................................................49 <br />4 <br />55 <br />KimleyoHorn <br />P age I i <br />
The URL can be used to link to this page
Your browser does not support the video tag.