My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-040 - Mainplace Mall Transformation
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2019
>
2019-040 - Mainplace Mall Transformation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2019 10:01:52 AM
Creation date
6/20/2019 8:39:53 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2019-040
Date
6/4/2019
Destruction Year
P
Document Relationships
2019-041 - Approving Tentative Parcel Map No. 2018-01
(Amended By)
Path:
\Resolutions\CITY COUNCIL\2011 -\2019
NS-2967 - Approving Development Agreement No. 2018-02 Between City of Santa Ana and Mainplace ShoppingTown, LLC for Mainplace Mall Transformation Project
(Amended By)
Path:
\Ordinances\2011 - 2020 (NS-2813 - NS-3000)\2019 (NS-2963 - NS-2978)
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2935
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana Main Place Mall Transformation Project <br />traffic Impact Study <br />FIGURES <br />Figure1— <br />Vicinity Map..................................................................................................................................................5 <br />Figure2 — <br />Existing Site Plan...........................................................................................................................................7 <br />Figure3 — <br />Project Site Plan............................................................................................................................................9 <br />Figure 4 — <br />Existing Lane Configuration and Traffic Control.........................................................................................17 <br />Figure 5 — <br />Existing Peak Hour Traffic Volumes............................................................................................................23 <br />Figure 6A— <br />Project Trip Distribution Assumptions - Retail.........................................................................................31 <br />Figure 6B— <br />Project Trip Distribution Assumptions - Hotel..........................................................................................33 <br />Figure 6C <br />— Project Trip Distribution Assumptions - Office.........................................................................................35 <br />Figure ED— <br />Project Trip Distribution Assumptions - Residential- ................................................................................37 <br />Figure 7 — <br />Project -Related Traffic Volumes.................................................................................................................39 <br />Figure 8— <br />Existing Plus Proposed Project Traffic Volumes..........................................................................................47 <br />Figure 9— <br />Existing Plus Current Project Entitlements Traffic Volumes.......................................................................51 <br />TABLES <br />Table 1: MainPlace Mall Summary of Approved and Proposed Land Uses...................................................................4 <br />Table 2: Traffic Study Area Intersections.....................................................................................................................11 <br />Table 3: Level of Service Ranges..................................................................................................................................12 <br />Table 4: City of Santa Ana Arterial Highways Capacity Values....................................................................................13 <br />Table 5: City of Orange Arterial Daily Capacity Threshold Assumptions.....................................................................13 <br />Table 6: Intersection Operations: Existing Conditions.................................................................................................21 <br />Table 7: Roadway Segment Analysis: Existing Conditions...........................................................................................25 <br />Table 8: Project Trip Generation.................................................................................................................................27 <br />Table 9: Currently Entitled Development Trip Generation..........................................................................................28 <br />Table 10: Trip Generation Comparison........................................................................................................................29 <br />Table 11: Intersection Operations: Existing Plus Proposed Project.............................................................................43 <br />Table 12: Roadway Segment Analysis: Existing Plus Proposed Project.......................................................................46 <br />Table 13: Intersection Operations: Comparison of Existing Plus Proposed Project to Existing Plus Current Project <br />Entitlements................................................................................................................................................53 <br />APPENDICES <br />Appendix A —Traffic Data Collection Worksheets <br />Appendix B — Intersection Analysis Worksheets <br />Appendix C—School District Boundaries <br />KimleyoHorn Page I r <br />
The URL can be used to link to this page
Your browser does not support the video tag.