Laserfiche WebLink
MacArthur Boulevard Resurfacing: Flower to <br />Main <br />ROJECT CATEGORY: <br />Street Improvements - <br />Arterial Street Rehabilitation <br />LOCATION MAP <br />N WWernry A.ry !IY.:r::rAr„ fWomerAw <br />5 <br />j � 8 <br />F 3 <br />vim, wgrw [ov.r cn �.' <br />w <br />S <br />CITY OF SANTA ANA FY 19/20 CI <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Reconstruction/resurfacing of existing pavement and <br />replacemenbinstallation of missing or damaged, curbs, <br />gutters, sidewalks, driveway approaches, and <br />wheelchair ramps within this segment of roadway. <br />PROJECT NEED: <br />The City's Pavement Management Program (PMP) has <br />been developed to prioritize and recommend the most <br />cost-effective roadway repairs, and maximize the return <br />from available funding for street pavement. This <br />segment of MacArthur Boulevard pavement <br />rehabilitation is identified as a high priority in the PMP. <br />PROJECT COSTS <br />FY 1920 FY 20121 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 <br />Construction <br />$1,019,000 <br />Engineering <br />$81,000 <br />TOTAL <br />$1,100,000 <br />SOURCE OF FUNDS <br />FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 <br />RMRA S61 <br />$1,100,000 <br />TOTAL <br />$1,100,000 <br />AGENCY DIVISION: CONTACT: DATE: <br />Public Works Agency Design Engineering Kenny Nguyen, Senior Civil Engineer 24-May-2019 <br />-13- <br />