My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRESENTATION - 75A
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
06/18/2019
>
PRESENTATION - 75A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 9:16:32 AM
Creation date
6/21/2019 10:49:53 AM
Metadata
Fields
Template:
City Clerk
Agency
Finance & Management Services
Item #
75A
Date
6/18/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
744
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MacArthur Boulevard Resurfacing: Flower to <br />Main <br />ROJECT CATEGORY: <br />Street Improvements - <br />Arterial Street Rehabilitation <br />LOCATION MAP <br />N WWernry A.ry !IY.:r::rAr„ fWomerAw <br />5 <br />j � 8 <br />F 3 <br />vim, wgrw [ov.r cn �.' <br />w <br />S <br />CITY OF SANTA ANA FY 19/20 CI <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Reconstruction/resurfacing of existing pavement and <br />replacemenbinstallation of missing or damaged, curbs, <br />gutters, sidewalks, driveway approaches, and <br />wheelchair ramps within this segment of roadway. <br />PROJECT NEED: <br />The City's Pavement Management Program (PMP) has <br />been developed to prioritize and recommend the most <br />cost-effective roadway repairs, and maximize the return <br />from available funding for street pavement. This <br />segment of MacArthur Boulevard pavement <br />rehabilitation is identified as a high priority in the PMP. <br />PROJECT COSTS <br />FY 1920 FY 20121 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 <br />Construction <br />$1,019,000 <br />Engineering <br />$81,000 <br />TOTAL <br />$1,100,000 <br />SOURCE OF FUNDS <br />FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 FY 25/26 <br />RMRA S61 <br />$1,100,000 <br />TOTAL <br />$1,100,000 <br />AGENCY DIVISION: CONTACT: DATE: <br />Public Works Agency Design Engineering Kenny Nguyen, Senior Civil Engineer 24-May-2019 <br />-13- <br />
The URL can be used to link to this page
Your browser does not support the video tag.