Laserfiche WebLink
ROJECT TITLE: <br />Main Street Rehabilitation: Warner to Edinger <br />ROJECT CATEGORY: <br />Street Improvements - <br />Arterial Street Rehabilitation <br />LOCATION MAP <br />WEdmgx w.e <br />j <br />F FEWx11n <br />FSVMnNN <br />pp <br />2 <br />wwmwu s, <br />: <br />rWvroi4 sr � <br />~ <br />F <br />}4 <br />lS, 4um.p <br />r.'J� <br />WMIUR,R � <br />tl <br />S <br />I4i�v.,M <br />W W.r .' w <br />E Wu A. <br />E.WunwAW.. <br />I <br />CITY OF SANTA ANA FY 19/20 CI <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Reconstruction/resurfacing of existing pavement and <br />replacement/installation of missing or damaged, curbs, <br />gutters, sidewalks, driveway approaches, and <br />wheelchair ramps within this segment of roadway. <br />PROJECT NEED: <br />The City's Pavement Management Program (PMP) has <br />been developed to prioritize and recommend the most <br />cost-effective roadway repairs, and maximize the return <br />from available funding for street pavement. This <br />segment of Main Street pavement rehabilitation is <br />identified as a high priority in the PMP. <br />PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22123 FY 23/24 FY 24/25 FY 25/26 <br />Construction $1,148,541 <br />TOTAL $1,148,541 <br />SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23124 FY 24/25 FY 25/26 <br />RMRA SBI $1, 148,541 <br />TOTAL $1,148.541 <br />AGENCY <br />DIVISION: <br />CONTACT: <br />DATE: <br />Public Works Agency <br />Design Engineering <br />Jason Gabriel, Principal Civil Engineer <br />24-May-2019 <br />-14- <br />