My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRESENTATION - 75A
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
06/18/2019
>
PRESENTATION - 75A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 9:16:32 AM
Creation date
6/21/2019 10:49:53 AM
Metadata
Fields
Template:
City Clerk
Agency
Finance & Management Services
Item #
75A
Date
6/18/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
744
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROJECT TITLE: <br />Main Street Rehabilitation: Warner to Edinger <br />ROJECT CATEGORY: <br />Street Improvements - <br />Arterial Street Rehabilitation <br />LOCATION MAP <br />WEdmgx w.e <br />j <br />F FEWx11n <br />FSVMnNN <br />pp <br />2 <br />wwmwu s, <br />: <br />rWvroi4 sr � <br />~ <br />F <br />}4 <br />lS, 4um.p <br />r.'J� <br />WMIUR,R � <br />tl <br />S <br />I4i�v.,M <br />W W.r .' w <br />E Wu A. <br />E.WunwAW.. <br />I <br />CITY OF SANTA ANA FY 19/20 CI <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />Reconstruction/resurfacing of existing pavement and <br />replacement/installation of missing or damaged, curbs, <br />gutters, sidewalks, driveway approaches, and <br />wheelchair ramps within this segment of roadway. <br />PROJECT NEED: <br />The City's Pavement Management Program (PMP) has <br />been developed to prioritize and recommend the most <br />cost-effective roadway repairs, and maximize the return <br />from available funding for street pavement. This <br />segment of Main Street pavement rehabilitation is <br />identified as a high priority in the PMP. <br />PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22123 FY 23/24 FY 24/25 FY 25/26 <br />Construction $1,148,541 <br />TOTAL $1,148,541 <br />SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21/22 FY 22/23 FY 23124 FY 24/25 FY 25/26 <br />RMRA SBI $1, 148,541 <br />TOTAL $1,148.541 <br />AGENCY <br />DIVISION: <br />CONTACT: <br />DATE: <br />Public Works Agency <br />Design Engineering <br />Jason Gabriel, Principal Civil Engineer <br />24-May-2019 <br />-14- <br />
The URL can be used to link to this page
Your browser does not support the video tag.