Laserfiche WebLink
ROJECT TITLE: <br />Bristol Street Improvements and Widening: <br />Phase 4 - Warner to Saint Andrew <br />ROJECT CATEGORY: <br />Street Improvements - <br />Street/Bridge Improvements & Widening <br />IS147AIL6PWGI� <br />CITY OF SANTA ANA FY 19/20 CI `" i <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />PROJECT DESCRIPTION: <br />The Bristol Street Improvements project was planned <br />and designed to incorporate complete street concepts <br />with storm drain quality features. The improvements <br />include widening of the street from four lanes to six <br />lanes, with bus turnouts, raised median, bike lanes, and <br />sound walls. The project also brings native and organic <br />landscaping that beautifies a fully developed urban <br />PROJECT NEED: <br />Bristol Street from Warner Avenue to St. Andrew <br />Place (Phase 4) is part of the City's plan to widen <br />Bristol Street from WamerAvenue to Memory Lane, <br />which was approved by City Council in 1990 and <br />reevaluated in 2015. Existing roadway has only 2lanes <br />in each direction and is operating at a LOS F. This <br />widening is needed to improve traffic flow and create <br />complete streets features. <br />PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 FY 22123 FY 23/24 FY 24/25 FY 25/26 <br />.- <br />Construction $247,800 <br />TOTAL 5247,600 <br />SOURCE OF FUNDS FY 19/20 FY20/21 FY21/22 FY22/23 FY23/24 FY24/25 FY25/26 <br />GAS TAX $200,000 <br />M2 LOCAL $47,800 <br />FAIRSHARE <br />TOTAL $247,800 <br />AGENCY <br />DIVISION: <br />CONTACT: <br />DATE: <br />Public Works Agency <br />Design Engineering <br />Sean Thomas, Senior Civil Engineer <br />24-May-2019 <br />-16- <br />