My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRESENTATION - 75A
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
06/18/2019
>
PRESENTATION - 75A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 9:16:32 AM
Creation date
6/21/2019 10:49:53 AM
Metadata
Fields
Template:
City Clerk
Agency
Finance & Management Services
Item #
75A
Date
6/18/2019
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
744
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA FY 19/20 CI <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />am <br />PROJECT TITLE: <br />PROJECT DESCRIPTION: <br />PROJECT NEED: <br />Main Street Slurry Seal and Resurfacing: <br />Application of slurry seal, crack seal, and minor <br />The City's Pavement Management Program has been <br />Memory to City Limit <br />pavement resurfacing with asphalt concrete. The work <br />developed to identify the preventative maintenance <br />also include replacement installation of missing or <br />requirements for the City's street network. The <br />PROJECT CATEGORY: <br />damaged curbs, gutters, sidewalk, driveway <br />application of a surface seal to streets with <br />approaches, wheelchair ramps, and striping. <br />improvements constructed in the last 10 years will <br />Street Improvements - <br />ensure a high level of service for years to come. <br />Arterial Street Rehabilitation <br />LOCATION MAP <br />i <br />i <br />i <br />PROJECT COSTS FY 19/20 FY 20/21 FY 21/22 <br />FY 22/23 FY 23/24 FY 24125 FY 25/26 <br />✓ - <br />Construction $370,000 <br />Engineering $30,000 <br />TOTAL $400,000 <br />'N Tom wd Country Rd <br />z <br />SOURCE OF FUNDS FY 19/20 FY 20/21 FY 21122 <br />FY 22/23 FY 23/24 FY 24125 FY 25/26 <br />M2 LOCAL $400.000 <br />-- <br />FAIRSHARE <br />06 <br />TOTAL E400,o00 <br />AGENCY <br />DIVISION: <br />CONTACT: <br />DATE: <br />Public Works Agency <br />Design Engineering <br />Kenny Nguyen, Senior Civil Engineer <br />24-May-2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.