My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-050 -Adopting Local CEQA Guidelines
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2019
>
2019-050 -Adopting Local CEQA Guidelines
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2023 4:54:33 PM
Creation date
6/24/2019 8:39:18 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2019-050
Date
6/18/2019
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Guidelines for Implementing the <br />California Environmental Quality Act (2019) INITIAL STUDY <br /> <br />In the event of an accidental discovery of a possible unique archaeological resource <br />during construction of the project, the City may provide for the evaluation of the find by a <br />qualified archaeologist. If the find is determined to be a unique archaeological resource, the City <br />should take appropriate steps to implement appropriate avoidance or mitigation measures. Work <br />on non-affected portions of the project, as determined by the City, may continue during the <br />process. Curation may be an appropriate mitigation measure for an artifact that must be removed <br />during project excavation or testing. <br />When an Initial Study identifies the existence of, or the probable likelihood of, Native <br />American human remains within the Project, the City shall comply with the provisions of State <br />CEQA Guidelines Section 15064.5(d). In the event of an accidental discovery or recognition of <br />any human remains in any location other than a dedicated cemetery, the City shall comply with <br />the provisions of State CEQA Guidelines Section 15064.5(e). <br />5.16 C ONSULTATION WITH W ATER A GENCIES R EGARDING L ARGE D EVELOPMENT <br />P ROJECTS. <br />(a) Projects Subject to Consultation Requirements. <br />For certain development projects, cities and counties must consult with water agencies. <br />If the City is a municipal water provider, the city or county may request that the City prepare a <br />water supply assessment to be included in the relevant environmental documentation for the <br />project. The City may refer to this section when preparing such an assessment or when <br />reviewing projects in its role as a Responsible Agency. This section applies only to water <br />demand projects as defined by Local Guidelines Section 11.83. Program level environmental <br />review may not need to be as extensive as project level environmental review. (See Local <br />Guidelines Sections 8.03 and 8.08.) <br />(b) Water Supply Assessment. <br />When a city or county as Lead Agency determines the type of environmental document <br />that will be prepared for a water demand project or any project that includes a water demand <br />project, the city or county must identify any public water system (as defined in Local Guidelines <br />Sections 11.59 and 11.83) that may supply water for the project. The city or county must also <br />request that the public water system determine whether the projected demand associated with the <br />project was included in the most recently adopted Urban Water Management Plan. The city or <br />county must also request that the public water system prepare a specified water supply <br />assessment for approval at a regular or special meeting of the public water system governing <br />body. A sample request for a water supply assessment is provided as For <br />CEQA Guidelines. <br />If no public water system is identified that may supply water for the water demand <br />project, the city or county shall prepare the water supply assessment. The city or county shall <br />consult with any entity serving domestic water supplies whose service area includes the site of <br />the water demand project, the local agency formation commission, and the governing body of <br />any public water system adjacent to the site of the water demand project. The city council or <br /> <br />2019 City of Santa Ana Local Guidelines 5-14 ©Best Best & Krieger LLP <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.