My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-050 -Adopting Local CEQA Guidelines
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2019
>
2019-050 -Adopting Local CEQA Guidelines
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2023 4:54:33 PM
Creation date
6/24/2019 8:39:18 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2019-050
Date
6/18/2019
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Local Guidelines for Implementing the <br />California Environmental Quality Act (2019) ENVIRONMENTAL IMPACT REPORT <br /> <br />requirement in all contracts for the performance of the work. The request for certification must <br />be made and granted prior to the release of the Draft EIR. If the Governor certifies the project, <br />the lead agency must make the administrative record available concurrently with the Draft EIR <br />and certify the administrative record within five (5) days of project approval and must make it <br />available in an electronic format. Within 10 days of the Governor certifying an Environmental <br />Leadership Development Project, the Lead A <br />public notice. See Public Resources Code Section 21187 for the language to be used in the public <br />notice. If litigation is filed against such a project, certain fast-tracked litigation procedures will <br />apply. Please see Public Resources Code Section 21178 and Sections 21183 through 21187 for a <br />complete description of the requirements for such projects. <br />7.06 P REPARATION OF D RAFT EIR. <br />The Lead Agency is responsible for preparing a Draft EIR. The Lead Agency may begin <br />preparation of the Draft EIR without awaiting responses to the Notice of Preparation. However, <br />information communicated to the Lead Agency not later than thirty (30) days after receipt of the <br />Notice of Preparation shall be included in the Draft EIR. <br />7.07 C ONSULTATION WITH C ALIFORNIA N ATIVE A MERICAN T RIBES. <br />Prior to the release of a Draft EIR for a project, the Lead Agency shall begin consultation <br />with a California Native American tribe that is traditionally and culturally affiliated with the <br />geographic area of the proposed project if: <br />(a) The California Native American tribe requested to the Lead Agency, in writing, to <br />be informed by the Lead Agency through formal notification of proposed projects <br />in the geographic area that is traditionally and culturally affiliated with the tribe; <br />and <br /> <br />(b) The California Native American tribe responds, in writing, within 30 days of <br />receipt of the formal notification, and requests the consultation. The California <br />Native American tribe shall designate a lead contact person when responding to <br />the Lead Agency. If a lead contact is not designated by the California Native <br />American tribe, or if it designates multiple lead contact people, the Lead Agency <br />shall defer to the individuals listed on the contact list maintained by the Native <br />American Heritage Commission. Consultation is defined in Local Guidelines <br />Section 11.12. <br /> <br />To expedite the requirements of this section, the Native American Heritage Commission <br />shall assist the Lead Agency in identifying the California American Native tribes that are <br />traditionally and culturally affiliated with the project area. <br /> <br />Within 14 days of determining that an application for a project is complete or a decision <br />by a public agency to undertake a project, the Lead Agency shall provide formal notification to <br />the designated contact of, or a trial representative of, traditionally and culturally affiliated <br />California Native America tribes that have requested notice, which shall be accomplished by at <br />least one written notification that includes a brief description of the proposed project and its <br /> <br />2019 City of Santa Ana Local Guidelines 7-4 ©Best Best & Krieger LLP <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.