My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - RESO WATER SUPPLY ASSESSMENT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
07/02/2019
>
55A - RESO WATER SUPPLY ASSESSMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2019 5:19:54 PM
Creation date
6/27/2019 5:06:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55A
Date
7/2/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ELAN PROJECT <br />WATER SUPPLY A55ESSMENT <br />TABLE OF CONTENTS <br />2a17 <br />1. <br />WSA PURPOSE AND BACKGROUND ............................................ 4 <br />2. <br />INTRODUCTION............................................................ <br />I........ 6 <br />2.1 <br />Project Description.............................................................................................6 <br />2.1.1 <br />Existing Water Use......................................................................................8 <br />2.1.2 <br />Proposed Water Use.................................................................................10 <br />3. <br />REGIONAL WATER SUPPLIES AND DEMANDS <br />12 <br />.............................. <br />3.1 <br />City Water Supplies.........................................................................................12 <br />3.2 <br />City Water Demands.......................................................................................18 <br />4. <br />REGIONAL WATER SUPPLY RELIABILITY ...................................... 20 <br />4.1 <br />Metropolitan Water District regional water supply reliability.................................20 <br />4.2 <br />OCWD and City of Santa Ana Local Water supply reliability................................21 <br />5. <br />CONCLUSION..................................................................... 27 <br />6. <br />REFERENCES........................................................................28 <br />7. <br />TECHNICAL APPENDICES........................................................ <br />29 <br />LIST OF FIGURES <br />Figure1 Vicinity Map.......................................................................................................7 <br />Figure 2 Existing Land Use Aerial......................................................................................9 <br />Figure 3 Proposed Elan Site Plan....................................................................................I I <br />FuscOE ENGINEERING, INC. <br />I <br />55A-106 <br />
The URL can be used to link to this page
Your browser does not support the video tag.