My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - RESO WATER SUPPLY ASSESSMENT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
07/02/2019
>
55A - RESO WATER SUPPLY ASSESSMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2019 5:19:54 PM
Creation date
6/27/2019 5:06:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55A
Date
7/2/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ELAN PROJECT <br />WATER SUPPLY ASSESSMENT <br />LIST OF TABLES <br />NOVEMBER 2, 2017 <br />Table 1 Project Home Type Details...................................................................................6 <br />Table2 Existing Water Demands......................................................................................8 <br />Table 3 Proposed Water Demands.................................................................................10 <br />Table 4 City of Santa Ana Connections to Metropolitan Facilities.......................................12 <br />Table 5 2015 Projected and Actual Water Supply and Demand (Acre-feet).........................13 <br />Table 6 City of Santa Ana Groundwater Production Data 2015-16...................................15 <br />Table 7 City of Santa Ana Projected Total Water Demands...............................................19 <br />Table 8 Metropolitan Multiple Climate Scenario Water Supply Capability and Projected <br />Demands Comparison from 2020-2040 (AF)..................................................................21 <br />Table 9 City of Santa Ana Multiple Climate Scenario Water Supply and Demand Comparison <br />from2020-2040(AF)....................................................................................................23 <br />Table 10 City of Santa Ana Ability to Supply the Elan Project.............................................25 <br />LIST OF APPENDICES <br />Appendix A— Proposed Project Water Demand Calculations <br />Appendix B — City of Santa Ana Landscape Guidelines <br />Appendix C—SGMA Basin 8-1 Alternative Plan <br />FUSCOE ENGINEERING, <br />55A-107 <br />
The URL can be used to link to this page
Your browser does not support the video tag.