Laserfiche WebLink
August 18, 2003 <br />Page 2 <br />PS-13 The project developer shall submit to the District a School Access Plan <br />that provides for the safe passage of students to and from Willard <br />Intermediate School and the Orange County High School of the Arts. <br />The Plan shall be subject to approval by the District before construction <br />activities are initiated. The Plan shall include but not be limited to the <br />following measures: <br />❑ The closure of the sidewalks on Washington Avenue, 101h Street, <br />Sycamore Street and Broadway Street adjacent to the project <br />site. Appropriate signs shall be posted that these sidewalks are <br />closed and pedestrians are directed to use the sidewalks on the <br />opposite sides of these streets. <br />❑ Barricading the perimeter of the project site with temporary <br />fencing to secure construction equipment, minimize <br />trespassing, vandalism and short-cut attractions, and to reduce <br />hazards to students during project demolition activities. <br />❑ The posting of a flag person at the entrances) to the project site <br />to protect pedestrians from conflicts with heavy equipment and <br />haul trucks entering or leaving the project site during the times <br />of school arrivals and departures. <br />❑ The funding of crossing guards at the intersection of <br />Washington and Broadway Street, Washington Avenue and <br />Sycamore Street, 10th Street and Sycamore Street, and 101h <br />Street and Broadway Street. Crossing guards will be provided <br />during the times of school arrivals and departures when the <br />schools are in session Monday through Friday. <br />If determined necessary by the Principal of the Orange County <br />High School of the Arts, provide crossing guards at the <br />intersection of Sycamore Street and 101h Street when special day <br />time performances are held at the Orange County High School <br />of the Arts auditorium located just to the east of the above <br />intersection. <br />❑ Provide sufficient written notice of commencement and <br />completion of project construction activities to the Principals of <br />Willard Intermediate School and the Orange County High School <br />of the Arts. <br />❑ Provide the name and telephone number of contact person <br />knowledgeable about the project for the project developer and <br />construction contractor for use by the Principals of Willard <br />Intermediate School and the Orange County High School of the <br />Arts. <br />Parking at the Orange County High School of the Arts will be impacted by <br />construction of the proposed project. This is due to the need to remove the existing d <br />parking lot located on the project site that is used by High School staff and students. <br />C:\Documents and Servings\user\Desktop\word documents\response to comments one broadway pozo.DOC Page 2 of 5 <br />