My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ONE BROADWAY PLAZA DEV.- EXHIBITS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
07/06/2004
>
ONE BROADWAY PLAZA DEV.- EXHIBITS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2024 12:33:14 PM
Creation date
7/23/2019 8:38:38 AM
Metadata
Fields
Template:
City Clerk
Item #
75E
Date
7/6/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The posting of a flag person at the entrance(s) to the project site to protect <br />pedestrians from conflicts with heavy equipment and haul trucks entering <br />or leaving the project site during the times of school arrivals and <br />departures. <br />The funding of crossing guards at the intersection of Washington Avenue <br />at Broadway Street, Washington Avenue at Sycamore Street, l Oth Street at <br />Sycamore Street, and 10`h Street at Broadway Street. Crossing guards shall <br />be provided during the times of school arrivals and departures when the <br />schools are in session Monday through Friday. If determined to be <br />necessary by the Principal of the Orange County High School of the Arts, <br />provide crossing guards at the intersection of Sycamore Street at 10th <br />Street when special daytime performances are held at the Orange County <br />High School of the Arts auditorium. <br />• Provide sufficient written notice of commencement and completion of <br />project construction activities to the Principals of Willard Intermediate <br />School and the Orange County High School of the Arts. <br />• Provide the name and telephone number of contact person knowledgeable <br />about the project for the project developer and construction contractor for <br />use by the Principals of Willard Intermediate School and the Orange <br />County High School of the arts. <br />R8-5 The comment raises concern if sufficient parking would be available for Orange <br />County High School of the Arts staff and students during the construction and <br />operation of the One Broadway Plaza project. <br />During construction of the One Broadway Plaza project the existing parking area <br />on Sycamore Street for Orange County High School of the Arts would be <br />available for parking. During the operation of the project a 540-space parking lot <br />at the southwest comer of 10th Street and Sycamore Street would available for <br />students, faculty and other staff. Additionally, available parking for students and <br />faculty would be available in the proposed student drop off area. <br />Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.