My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ONE BROADWAY PLAZA DEV.- EXHIBITS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2004
>
07/06/2004
>
ONE BROADWAY PLAZA DEV.- EXHIBITS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2024 12:33:14 PM
Creation date
7/23/2019 8:38:38 AM
Metadata
Fields
Template:
City Clerk
Item #
75E
Date
7/6/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
272
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
One Broadway Plaza Findings and Facts in Support of Findings <br />Environmental Impact Report <br />4.2.2.2 Findings Related to Fugitive Dust <br />Changes or alterations have been required in, or incorporated into, the One Broadway Plaza <br />project which avoid or substantially lessen the significant environmental effect as identified in <br />the EIR. <br />4.2.2.3 Facts in Support of the Finding Related to Fugitive Dust <br />Implementation of mitigation measure G-3, provided below, will substantially lessen the adverse <br />impacts of the One Broadway Plaza project related to fugitive dust, and will reduce these <br />potentially significant adverse impacts to below a level of significance. <br />G-3 Prior to obtaining a grading permit for project construction, the Final Geology and Soils <br />Report will specifically assess grading control with special emphasis on controlling fugitive <br />dust which could be generated during site preparation, grading and construction. The <br />reports will specifically provide for establishing procedures for dust control and monitoring <br />so that unacceptable levels of dust do not escape from the site. These dust control measures <br />will be coordinated with the dust control measures described in Section 3.4 (Air Quality). <br />The standards and procedures developed in the reports will be incorporated into the grading <br />plan to be followed by the project developer. <br />4.2.3.1 Potentially Significant Adverse Impact Related to Seismicity <br />As described in detail in Section 3.2 (Topography, Geology and Soils) in the FIR, construction <br />the One Broadway Plaza project will be subject to future seismic activity. <br />4.2.3.2 Findings Related to Seismicity <br />Changes or alterations have been required in, or incorporated into, the One Broadway Plaza <br />project which avoid or substantially lessen the significant environmental effect as identified in <br />the EIR. <br />4.2.3.3 Facts in Support of the Finding Related to Seismicity <br />Implementation of mitigation measure G-4, provided below, will substantially lessen the adverse <br />impacts of the One Broadway Plaza project related to seismicity, and will reduce these <br />potentially significant adverse impacts to below a level of significance. <br />G-4 All structures to be erected on the One Broadway Plaza site will be designed in accordance <br />with the seismic design provisions in the Final Geology and Soils Report and of the Uniform <br />Building Code to promote safety in the event of such an earthquake. <br />4.2.4.1 Potentially Significant Adverse Impact Related to Groundwater <br />U/vfregoso/wp51/reports/One ,Broadway final findings Page 21 <br />June 28, 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.